Laserfiche WebLink
PART 3: EXECUTION <br /> 3.01 INSTALLATION GENERAL REQUIREMENTS <br /> A. Anchor to masonry with expansion or toggle bolts where built-in anchorage is not provided; do not fasten to wood <br /> plugs set in masonry. <br /> B. Vertical members set into concrete or masonry: As shown. <br /> C. Bolts,screws,etc.,for field connections: Same material,finish as base material. <br /> 3.02 FIELD SPLICES,WELDS <br /> A. Continuously weld field splices and grind smooth where exposed to view. <br /> B. Fill exposed splice joints with body filler and sand smooth. <br /> C. Touch-up joints,welds with specified primer. <br /> END OF SECTION 05500 <br /> 1 <br /> 05500-3 No.99132-CP2 <br />