My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 MATERIALS <br /> A. Miscellaneous Steel: Mild Steel <br /> B. Structural Steel: ASTM A36. <br /> C. Fastenings: Bolts,welds,rivets or other fastenings as required. <br /> D. Anchor Bolts,Nuts: ASTM A307,Paragraph 1.3. <br /> E. Steel Pipe: ASTM A120 or A-53. <br /> F. Carbon Steel: ASTM A-366 or A569. <br /> G. Grating and Grating Treads: Welded steel gratings with 1'/" x 3/16" plain bearing bars, galvanized and prime ' <br /> painted 12-1/8" wide treads, with cast iron abrasive nosing, Klemp KW-194, for interior treads and formed steel <br /> safety nosing at exterior. <br /> H. Shop Paint Primer: Manufacturer's standard rust inhibiting primer. 1 <br /> I. Stainless Steel: ASTM A167,Type 302 or 304,#4 satin finish. <br /> J. Galvanizing: ASTM A123,Class B. <br /> 2.03 GENERAL REQUIREMENTS FOR FABRICATION <br /> A. Weld permanent connections wherever possible;use continuous welds where exposed and grind smooth, straighten <br /> members after welding. <br /> B. Do shop cutting,drilling,fitting wherever possible. Take field measurements before fabrication when required. <br /> C. Provide all supporting members,fasteners,framing,hangers,bracing,brackets,straps,bolts,angles,etc.required to <br /> set,connect the work rigidly and properly to other construction. <br /> 2.04 SHOP COATS PROTECTIVE TREATMENT <br /> A. Clean free of all mill scale, rust and foreign matter by wire brushing, scraping, sandblasting or flame cleaning. <br /> Remove grease,oil with solvent. Dust,dirt: Remove with air blast or brush. <br /> B. Apply one shop coat of specified primer to all ferrous metal products, except galvanized. Provide primer for field <br /> touch up. Be responsible for quality and adhesion of shop prime finish. <br /> C. Hot-dip galvanize all ferrous metal items exposed to weather in the finish work and shop prime with primer <br /> recommended for use on galvanized metal. <br /> 2.05 SCHEDULE OF MISCELLANEOUS METAL ITEMS <br /> A. Items listed in this Section are intended only as a guide,but this does not relieve responsibility for quantity and to <br /> include all similar items. Thoroughly examine all Drawings for items of miscellaneous metal fabrications. <br /> 1. Loose and fixed masonry lintels,as scheduled. <br /> 2. Field welded steel angles for support of storefront and masonry walls. <br /> 3. Other miscellaneous metal items shown on Drawings. <br /> 05500-2 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.