My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 FABRICATION ' <br /> A. Fabricate structural steel in accordance with referenced AISC publications. <br /> B. High Strength Bolted Construction Assembly: Tightening shall be done in accordance with Section 5, reference <br /> "Specifications for Structural Joints Using ASTM A325 or A490 Bolts." <br /> C. Welded Construction: In accordance with"AWS"reference specification. ' <br /> D. Do bracing,blocking,cutting,fitting,drilling,tapping,welding,punching,etc.as may be required to complete work <br /> and to join work of other trade contractors. Weld clip angles and plates to beams and punch holes for fastening ' <br /> work of other trades as shown on drawings. <br /> E. Provide all holes and connections for Work specified in other sections or shown for other trades and required to be <br /> fastened to steel furnished in this Section. ' <br /> F. During fabrication,provide all known holes specified in other sections or shown for other trades. <br /> G. Fabricator shall design shop and field connections unless detailed on the drawings. ' <br /> H. Bolt field connections,unless otherwise indicated on the drawings. <br /> 2.03 SHOP PAINTING ' <br /> A. Shop paint all steelwork. Steel work to receive fireproofing to be painted with appropriate UL tested primer or left , <br /> unpainted. <br /> B. Preparation Method: Steel Structures Painting Council (SSPQ SSPC-SP3, SP6 or SP10 surface preparation ' <br /> acceptable. <br /> C. Paint Application: One coat,2.0 mil dry thickness,in accordance with AISC publications. <br /> D. Hot-dip galvanize all ferrous metal exposed to weather in the finish work. Paint with recommended primer for use <br /> with galvanized metal. <br /> 2.04 GALVANIZING ' <br /> A. ASTM A123,Class B. <br /> PART 3: EXECUTION <br /> 3.01 ERECTION , <br /> A. Temporary Shoring and Bracing: Provide as required with connections of sufficient strength to bear imposed loads. <br /> Remove temporary members, connections when permanent members are in place and final connections are made. ' <br /> Provide temporary guy lines as required to achieve proper alignment of the structures as erection proceeds. <br /> B. Erect structural steel in accordance with AISC"Code of Standard Practice". ' <br /> C. Attached column bases, beam bearing plates, similar structural members: Aligned with wedges and shims. Grout <br /> per grout manufacturer's printed recommendations. ' <br /> D. Field Assembly: Fastening of compression members shall be done after the abutting surfaces have been brought <br /> completely into contact. <br /> 05100-4 No.99132-CP2 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.