Laserfiche WebLink
1.05 SUBMITTALS <br /> A. Test Reports <br /> 1. Submit test reports in duplicate indicating compliance with applicable specifications for compressive strength, ' <br /> absorption, weight, moisture content and dimensions for each type of masonry unit. Prior test data for tests <br /> performed within one year of bid date will be acceptable. <br /> 2. Submit reports on manufacturer's normal quality control. <br /> 3. Provide report on modified ASTM C67 test for face brick as follows: Test to determine if the exterior face ' <br /> brick will meet the SW grade requirements of ASTM C216. Testing is recommended to document <br /> compressive strength, saturation coefficient, dimensions, distortion and potential for efflorescence. For this <br /> testing, a total of 15 bricks will be required. Make the samples representative of the whole lot of brick from <br /> which they are selected and include specimens representative of the complete range of colors and sizes of the <br /> brick in the shipment. Upon completion of testing, cut several of the brick samples and observe the cross <br /> section for the presence of stratification. <br /> B. Samples ' <br /> 1. Manufacturer's samples: Preliminary selection of brick type and color has been based upon manufacturer's <br /> samples supplied to the Architect prior to bidding. Brick supplied to the site which, in the judgment of the <br /> Architect,varies significantly from these samples in color,color range or finish will be rejected. <br /> 2. Preliminary sample panels: At the site, erect a 2'-0" square panel of each brick type, incorporating the , <br /> preliminary mortar selection(s)and the full range of brick color to be expected. After review by the Architect, <br /> construct additional sample panels to adjust brick range and mortar color. Do not begin final production <br /> and/or delivery of materials until acceptance of preliminary sample panel. , <br /> 3. Composite sample panel: After acceptance of preliminary sample panel,construct a square panel as detailed <br /> incorporating all brick types, mortar colors and brick pattern shown on Drawings. Construct panel as a <br /> complete cavity wall system with insulation,flashing,rope wicks,cavity vents,ties and scored concrete block ' <br /> backup. Maintain panel as a quality control guide until completion of masonry work. <br /> C. Make submittals in accordance with Section 01300. , <br /> 1.06 PRODUCT DELIVERY,STORAGE AND HANDLING <br /> A. Handle,transport and store at the job site in a manner that will avoid damage. <br /> B. Protect masonry units from water. Deliver the units to the job cubed on pallets. <br /> C. Deliver and store scored masonry units with cardboard separators to reduce chipping and other damage to block <br /> surface and edges: <br /> D. Store materials under cover in dry place; in manner to prevent damage, intrusion of foreign material. During <br /> freezing weather protect all masonry units with tarpaulins or other suitable material. Store concrete masonry under <br /> covers that will permit circulation of air,prevent excessive moisture absorption;protect against wetting prior to use. <br /> 04200-2 No.99132-CP2 ' <br />