My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Convey grout from mixer to place of final deposit by means which will prevent segregation or loss of material. Do <br /> not let grout fall freely more than four(4)feet. <br /> PART 2: PRODUCTS <br /> 2.01 MANUFACTURERS <br /> A. Quality of manufacturers: The products named herein are specified to establish standards of quality and <br /> performance. The manufacturers approved for grout are U. S. Grout Corporation, Master Builders, Sonneborn, <br /> Euclid Chemical Company,W.R.Meadows,and L&M Construction Chemicals. <br /> 2.02 MATERIALS <br /> A. Equipment, Anchor Bolt and Base Plate Grouting: Non-metallic, non-staining, non-shrink cemetitious grout, <br /> ASTM C1107. Compressive strength shall be a minimum of 5000 p.s.i. at 28 days and a 1 day strength of 3000 <br /> p.s.i. <br /> B. Surface Repairs: For repair of concrete surfaces use the grout specified for equipment. Use an epoxy bonding <br /> compound to bond the repair grout to existing concrete. <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> A. Equipment and Base Plate Grouting: Proportion grout in accordance with the manufacturer's recommendations. <br /> Remove all loose or foreign materials which would prevent bond between the grout and mating surfaces. Clean and <br /> thoroughly moisten surfaces prior to starting Work. Completely fill all recesses and assure grout material is in <br /> complete contact with all steel and concrete surfaces. <br /> B. Anchor Bolt Grouting: Drill or cast in the concrete holes at locations shown on the plans or shop drawings. Make <br /> size of holes at least 1/2"larger than the bolt or dowel to be grouted. Clean and wet holes. Remove all loose water <br /> from the holes, fill about two-thirds full with grout; rod thoroughly to remove any entrapped air; insert the bolt or <br /> dowel and secure in place by use of templates. <br /> C. Surface Repairs to Concrete: Chip out concrete area requiring repairs to sound concrete. Clean reinforcing if <br /> exposed. Cut or saw edges to give a minimum of 1/2" surface perpendicular to the surface to be repaired. Coat all <br /> surfaces to be repaired with an epoxy bonding compound prior to placing the grout. See Concrete Specification , <br /> 03300 for curing requirements. <br /> END OF SECTION 03600 <br /> 03600-2 No.99132-CP2 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.