My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.) Perform compressive strength tests (ASTM C39). One set of four cylinders for each day's pour <br /> between one and 25 cubic yards. If a day's pour exceeds 25 cubic yards, one set of four cylinders <br /> for each additional 50 cubic yards, or fraction thereof. One specimen tested at seven days, two at <br /> 28 days,and one specimen retained in reserve for later testing if required. <br /> 3.) Slump (ASTM C143): one test at point of discharge for each set of compression test specimens; <br /> additional tests when concrete consistency appears to have changed. <br /> 4.) Air entrainment(ASTM C231): test the first batch of air entrained concrete and one additional test <br /> for each set of compression test specimens. <br /> 5.) Test concrete temperature hourly when air temperature is 40°F and below and when 80°F and <br /> above;and each time is set of compression test specimens is made. <br /> 1 b. Perform concrete mix verification. Qualifications: Technical I. Verify the following: <br /> 1.) Mixer truck trip ticket conforms to approved mix design. <br /> 2.) Total water added to mix on site does not exceed that allowed by concrete mix design. <br /> 3.) Concrete quality is indicative of adequate mixing time,consistency,and relevant time limits. <br /> C. Inspect preparation and placement of all concrete, excluding slabs on grade, strip footings without <br /> transverse reinforcement,and topping slabs. Qualifications: Structural I. Verify the following: <br /> r1.) Acceptable general condition of concrete base prior to placement. <br /> 2.) Concrete conveyance and depositing avoids segregation and contamination. <br /> 3.) Concrete is properly consolidated. <br /> 4.) Reinforcement remains at proper location. <br /> d. Observe protection and curing methods for all concrete, excluding slabs on grade, strip footings without <br /> transverse reinforcement,and topping slabs. Qualifications: Structural I. Verify the following: <br /> 1.) Specified curing procedures are followed. <br /> 2.) Specified hot and cold weather procedures are followed. <br /> B. Conventional Testing and Inspection Requirements <br /> 1. The Owner will employ a testing agent to perform density test of lightweight concrete per ASTM C567. One <br /> test,per-hghtweight pour <br /> C. Contractor Requirements: <br /> 1. Provide services of an independent laboratory to perform the following: <br /> a. Make and test additional cylinders to determine time for form removal. <br /> b. Make and test additional cylinders to determine termination of curing procedures. <br /> C. Make and test additional cylinders to determine termination of cold weather practices. <br /> 03300-11 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.