My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Troweled finish: <br /> 1) Power trowel surface to smooth finish. <br /> 2) Hand trowel areas inaccessible to power trowel. <br /> d. Broom or belt finish: Draw broom or burlap belt across surface after floating in accordance with P.C.A. <br /> instructions. <br /> e. Conform to ACI 301,Section 11.9,Class B tolerance. <br /> E. Finish Schedule <br /> 1. As-Cast Finish: Concealed walls,columns,beams,slabs. <br /> 2. Rubbed Finish: Exposed concrete-walls,columns,beams,and wall caps. <br /> 3. Float Finish: Slabs to receive topping or setting beds. <br /> 4. Troweled Finish: <br /> a. Interior concrete floors: Steel troweled finish <br /> ' b. Exposed concrete stair treads: Steel troweled finish with non-slip aggregate. <br /> 5. Broom Finish <br /> a. Exterior platforms,aprons,ramps,loading dock. <br /> 3.06 CURING AND PROTECTION <br /> A. Protect fresh concrete from premature drying and excessively hot or cold temperatures and maintain with minimal <br /> moisture loss at a relatively constant temperature above 55°F for a period of time given below. <br /> tB. Follow finishing operations with initial curing. Keep concrete continuously moist after finishing until curing <br /> materials are applied. Use the following materials or methods: <br /> 1. For concrete to remain exposed (not scheduled for finish): Apply one coat of interior curing compound <br /> initially and an additional coat just prior to substantial completion. <br /> 2. For interior concrete to receive floor finish (except high performance coatings): Apply one coat of curing <br /> compound for use with hardener and apply hardener coat to concrete that is dry, clean, free of dirt, oil grease <br /> and cured for seven days. Apply coatings in strict accordance to manufacturers printed instructions. <br /> 3. For interior concrete to receive high performance coating or concrete floor sealer: Use moisture-cover curing <br /> technique. <br /> 4. For exterior or semi exterior concrete: Apply one coat of exterior curing compound in strict accordance with <br /> manufacturers printed instructions. After allowing concrete to cure for at least 28 days and insuring concrete <br /> is dry,clean,free of dirt,oil,grease,loose scale or other contaminates,apply two coats of linseed oil treatment <br /> in strict accordance to manufactures printed instructions. <br /> C. Continue curing until the cumulative number of days or fractions thereof,not necessarily consecutive,during which <br /> temperature of air in contact with concrete is above 50°F has totaled 7 days. Do not permit rapid drying at end of <br /> curing period. Maintain curing for members with specified strengths of 6000 psi and above until laboratory <br /> cylinders reach the 28-day specified strength. <br /> 03300-9 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.