Laserfiche WebLink
FILE#17-3949 <br /> Meeting Date August 20,2017 <br /> Page 4 of 5 <br /> preserve the property rights of the owner and supported by the vulnerable lake yard <br /> slope on the property. <br /> 11. The granting of the proposed variance will not in any way impair health, safety, comfort <br /> or morals,or in any other respect be contrary to the intent of this chapter. Granting the <br /> lakeyard setback variance allowing the retaining walls within the 75-foot lake setback <br /> will not adversely impact health,safety,comfort or morals,or in any way be contrary <br /> to the ordinances. <br /> 12. The granting of such variance will not merely serve as a convenience to the applicant, <br /> but is necessary to alleviate demonstrable difficulty.The applicant has demonstrated <br /> practical difficulties which support granting the lakeyard setback variance to permit <br /> the construction of the tiered retaining walls and in-kind replacement of the stairs <br /> within 75 feet of the OHWL. <br /> The Commission may recommend or Council may impose conditions in granting of variances. <br /> Any conditions imposed must be directly related to and must bear a rough proportionality to <br /> the impact created by the variance. No variance shall be granted or changed beyond the use <br /> permitted in this chapter in the district where such land is located. <br /> Septic System Status <br /> The property is served by City sewer. <br /> Practical Difficulties Statement <br /> Applicant has completed the Practical Difficulties Documentation Form attached as Exhibit B,and <br /> should be asked for additional testimony regarding the application. <br /> Practical Difficulties Analysis <br /> Regarding the addition of retaining walls supporting the lake access stair and at the top of the <br /> slope,staff finds practical difficulties exist in the existing condition, and the need to stabilize and <br /> protect the slope from erosion. The portions of wall and the stairs are an in-kind replacement; <br /> two additional retaining walls near the top of the slope are meant to better stabilize the slope; <br /> the applicant also is proposing to construct one linear wall placed along the shoreline above the <br /> riprap. <br /> Staff conducted a site visit and based on the observed of the site conditions and the submitting <br /> information in the applicant. Staff is suggesting approval of the project with screening of all of <br /> the retaining walls be required to preserve the natural look of the shoreline when viewed from <br /> the lake. <br /> Staff has concerns regarding the linear retaining wall that runs along the shoreline that is <br /> connected to the rip rap. Planning Commission is asked to discuss the necessity, plantings, and <br /> screening of the proposed retaining wall. See Exhibit J from the applicant when discussing the <br /> bottom retaining wall and Exhibit K from the Minnehaha Creek Watershed District. <br /> Engineer Comments <br /> The City's engineer has reviewed the proposed plan and requires engineered plans be submitted <br /> with the building permit.A thorough grading review by the City's engineer will occur upon <br /> submittal of the building permit for the walls. <br /> e <br />