Laserfiche WebLink
Traffic <br /> Westwood's traffic engineer reviewed the impacts of a 40-unit condominium building to the <br /> existing traffic volumes and the proposed County Road 19 improvement plans (See Exhibit J). In <br /> review of the Institute of Transportation Engineers Trip Generation Manual, Ninth Edition a 40- <br /> unit building will add 232 vehicle trips per day (116 entering and 116 exiting trips) and could <br /> increase the traffic volume by 3%.This increase is well below traffic volume standards for this <br /> classification of road (A-Minor Expander) which is designed for a traffic volume of 10,000- <br /> 15,000 vehicles/day. <br /> The AM peak volume for the proposed building is estimated at 18 trips (3 trips entering and 15 <br /> trips exiting) while the PM peak would be 21 trips (14 trips entering and 7 trips exiting). <br /> However, as noted above, our expected resident will be a retired empty nester with a second <br /> residence that will typically not be driving during AM or PM peak hours. <br /> The proposed County Road 19 improvement project will relieve traffic back-up in this area. The <br /> proposed plan will reconstruct County Highway 19 (Shadywood Road) to a three lane section <br /> (one lane in each direction with a center two-way left turn lane). This alignment would increase <br /> safety and mobility along Shadywood by allowing left turning traffic to enter the center lane <br /> while allowing through traffic to proceed on by.Thus, with the proposed improvements the <br /> added vehicles from our site will not adversely impact traffic volumes in the area. <br /> Neighborhood Compatibility <br /> The Freshwater Condominiums are designed both architecturally and physically to be <br /> compatible with the surrounding area. We are seeing a revitalization in the Navarre area with <br /> several buildings being remodeled and updated.The fresher look and image from these <br /> buildings reflect a more contemporary design of flat roofs and modern architectural elements. <br /> We are complimenting this look with our Freshwater Office Building and proposed <br /> condominiums.The Freshwater Condominiums and Office building will provide a nice transition <br /> along the County Road 19 corridor from residential neighborhoods to the city guided <br /> commercial and higher density district. Entering Navarre from the south the Freshwater <br /> Condominiums will be set back away from County Road 19 nestled into the trees then gradually <br /> stepping closer to the corridor in conjunction with the Freshwater Office building.The flat <br /> roofline will add to this transition as it minimizes the jaggered roofline and view shed of pitched <br /> roofs. (See Exhibit G) <br /> We believe that our proposed design is best suited for the site and neighborhood. The <br /> condominiums are strategically placed into the existing grade rather than altering the site with <br /> extensive grading. The height in the back side of the building is created solely because the site <br /> slopes away from County Road 19. By using the existing grade we are best able to preserve the <br /> existing topography and vegetation that would otherwise be removed. <br />