My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
05-15-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 2:22:29 PM
Creation date
2/6/2018 2:21:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,April 17,2017 <br /> 6:30 o'clock p.m. <br /> The proposed redevelopment of the property will conform to all applicable zoning regulations and no <br /> variances are requested. <br /> Staff provided an analysis of the conditional use permit criteria within the memo and the Planning <br /> Commission can review that criteria tonight. <br /> The applicant is proposing to change the nature of the property to support a different housing style. The <br /> proposed housing style is more in keeping with the immediate neighborhood. To accomplish the desired <br /> house style,the grade must be adjusted to fill the area previously used as driveway for a tuck-under <br /> garage. The proposed home will have a first floor garage elevated above the current grades by <br /> approximately seven feet. <br /> The City Engineer has conducted a review of the preliminary proposed grading plans and a more detailed <br /> review will be performed at the time of the building permit. Additional conditions may be applied at that <br /> time. <br /> Comments from the neighbors have been included in the Commission's packet. <br /> Planning Staff recommends approval of the conditional use permit with the following conditions: <br /> 1. The City Engineer and Watershed District shall approve the erosion control plan. <br /> 2. The street should be swept daily or as needed to keep debris off of Casco Point Road. <br /> 3. The applicant must conform to the City's and MCWD's erosion control regulations. <br /> 4. Only clean fill is to be imported to the site. <br /> 5. Conformance with the City Engineer's requirements at the time of the building permit. <br /> 6. Hauling shall occur during allowed construction hours only Monday through Friday 7 a.m. to <br /> 8 p.m. <br /> Page 37 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.