My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2017 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2017
>
05-15-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 2:22:29 PM
Creation date
2/6/2018 2:21:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,April 17,2017 <br /> 6:30 o'clock p.m. <br /> the average lakeshore setback being established by the existing houses as constructed with the <br /> original plat and subject to Staff recommendations. <br /> Gaffron noted if the house on Lot 3 is torn down,it will need to meet the 75-foot setback. Gaffron asked <br /> whether that house should meet the average setback as defined by 830 North Arm. <br /> Thiesse stated it probably cannot. <br /> Landgraver asked if the objective is to make it conform. <br /> Thiesse indicated it is to get it out of the 75-foot zone. <br /> Schwingler seconded the motion. VOTE: Ayes 6,Nays 0. <br /> 3. #17-3911 LAKE WEST DEVELOPMENT,LLC,3245 WAYZATA BOULEVARD WEST, <br /> ZONING CODE TEXT AMENDMENT,7:23 P.M.- <br /> Curt Fretham, Lake West Development, was present. <br /> Gaffron noted this item was tabled at the March Planning Commission meeting. Due to the cancellation <br /> of the April 5 work session,the Planning Commission should also refer to the attached work session <br /> packet. <br /> The contractor for the Hennepin County Wayzata Boulevard improvement project has obtained a permit <br /> from MnDOT to use a site at 365 Old Crystal Bay Road for the recycling and storage operation for <br /> Phase I of the highway improvements. Gaffron stated that takes some of the pressure off in terms of the <br /> timing of this application,but the applicant has requested that their application for a text amendment and <br /> IUP approval continue to be reviewed,as they would like to be prepared for use of the Eisinger site for <br /> later phases of the Wayzata Boulevard improvements.. <br /> Page 13 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.