16-3883 <br /> April 17,2017 <br /> Page 5of7 <br /> Road Improvements and/or Easements Needed <br /> Assuming the road will be private, the City will require a Road, Drainage and Utilities Easement <br /> over it. Standard perimeter drainage and utility easements around all property boundaries as well <br /> as conservation and flowage easements over the delineated wetlands will be required. An <br /> additional easement for sewer system maintenance would be appropriate to obtain as a condition <br /> of subdivision approval. <br /> Parks, Trails, Sidewalks; Park Dedication <br /> The CMP does not indicate any future trails along North Arm Drive. No sidewalks exist in this <br /> area of Orono and none are contemplated. There are not any planned parks nor anticipated park <br /> needs relative to development of this property. <br /> The City Code requires dedication of 8% of the land as public park, or payment of the equivalent <br /> value in cash. Assuming the City Council finds no need for a public park at this site, payment of <br /> the standard Park Dedication Fee for 2 new building lots would be appropriate; because these are <br /> lakeshore lots each with a predevelopment value of greater than $69,375, the park fee would be <br /> capped at the maximum of$5,550 per lot, for a total Park Fee of$11,100. <br /> Stormwater and Drainage Improvements & Fees <br /> Creation of a new road, homes, driveways and other impervious surfaces will require stormwater <br /> management measures, likely including creation of stormwater conveyance and storage systems. <br /> Ponding areas will require the establishment of easements and the ponding areas will not be <br /> creditable as dry buildable area. Stormwater management will be subject to City and MCWD <br /> review and approval. <br /> The property and each proposed lot are within Tier 1 of the Stormwater Overlay District, subject <br /> to a maximum hardcover per lot of 25%. <br /> The property will be subject to the Stormwater and Drainage Trunk (SW&DT) Fee. The Trunk <br /> Fee established in the 2016 Fee Schedule for 1-acre zoning districts is $5,250 per acre for each <br /> new lot being created, with a fee cap of 1.0 acre per new lot. Per Section 14-284, if the existing <br /> residence is intended to remain(on Lot 3),only Lots 1 and 2 would be subject to the SW&DT Fee; <br /> if the home on Lot 3 is intended to be removed, it would also be subject to the Fee. Therefore, the <br /> total SW&DT Fee will be either$10,500 or$15,750. <br /> Utility Locations/Availability/Assessments/Connection Fees <br /> Municipal sewer is available to serve development at this site. The property was assessed for 2 <br /> sewer units and 280 feet of frontage as part of the 1973 sewer project. For the proposed <br /> subdivision, no additional footage charge would be required, but a third sewer unit at the 2017 <br /> Connection Charge rate of $5,100 would be due upon final plat approval. (Note: this is the <br /> reduced rate based on the 2017 Fee Schedule which established a standard connection fee for sewer <br /> and water project areas past their 15-year assessment period, a savings of more than $6,000 <br /> compared to the fee in 2016). <br /> The existing sewer connection for the house on Lot 3 runs across proposed Lots 1 and 2 along the <br /> shoreline. Leaving it as-is will require establishment of easements between the properties. Adding <br /> sewer stubs to serve Lots 1 and 2 is likely necessary, and may be difficult, as the existing gravity <br /> line is approximately 15-20 feet below existing grade. An engineered design for these connections <br /> may be necessary. <br />