Laserfiche WebLink
Herman&Marilyn Crawford <br /> October 13, 1998 <br /> Page Two of Two <br /> 3. The following additional work will be required to complete a complete structural system: <br /> a. Install nails in all holes of Simpson anchors. <br /> b. Complete lintel system using two 1-3/4"x 9-1/4"microlams for all openings. <br /> C. Provide frost footing protection at foundation at lower level. <br /> 4. No oxher.significant deviations were noted. <br /> 5. Further special inspections will be conducted with final report to follow. <br /> If you have any questions,please contact me. <br /> Sincerely, <br /> J.H. DAHLMEIER ENGINEERING,INC. <br /> 4'IL <br /> Jo . Dahlmeier,P.E. <br /> JHD:hn <br /> Cc: City of Orono Building Inspections Dept./Bruce Vang <br /> Enclosures <br /> I hereby certify that this plan, specification or report was <br /> prepared by me or under my direct supervision and that I <br /> am a duly registered professional engineer under the laws <br /> of the to of Minnesota. <br /> (4 � <br /> Mi sota Registration No. 9212 <br />