My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: proposed slope reconstruction
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
4725 North Shore Drive - 07-117-23-32-0066
>
Correspondence
>
Re: proposed slope reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:36:12 PM
Creation date
1/31/2018 12:14:24 PM
Metadata
Fields
Template:
x Address Old
House Number
4725
Street Name
North Shore
Street Type
Drive
Address
4725 North Shore Dr
Document Type
Correspondence
PIN
0711723320066
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum Bonestroo <br /> Project: 4725 North Shore Drive 2335 Highway 36 W <br /> To: Darren Amundsen Slope Restoration Date: 11/8/10 St Paul,MN 55113 <br /> Owner: John Roedel Tel 651-636-4600 <br /> From: Philip Caswell,P.E. Client: City of Orono,MN Fax 651-636-1311 <br /> www.boresbw.com <br /> Re: 10-3490 File No:000139-10000-1 <br /> Review Summary: <br /> Revised and supplemental information for the proposed slope reconstruction at 4725 North <br /> Shore Drive has been reviewed and comments are provided below. The information provided <br /> includes the following: <br /> 1. Drawings—Civil Solutions Group, LLC: 1) SITE PLAN <br /> (dated 11-4-10) 2)TYPICAL SLOPE SECTION <br /> 2. Memorandum —Civil Solutions Group, LLC(dated 11-4-10) <br /> 3. Design Calculations—Civil Solutions Group, LLC(dated 11-4-10) <br /> 4. Geotechnical Report Addendum #1—Northern Technologies, Inc. <br /> (dated 11-4-10) <br /> This information directly addresses the review comments provided following our previous <br /> review(Bonestroo,October 28, 2010). Specifically,these revisions and responses include: <br /> Re.Comment No. 1: The bench at dimensions have been revised to OSHA Standards <br /> This is acceptable. We further understand that the work will progress from the slope toe <br /> upward, so that the exposure of the free-standing vertical cuts will be minimized. <br /> Re.Comment No. 2:As per the geotechnical engineer for this project(Northem Technologies, <br /> Inc.)the design parameters for the on-site material shall be 500 lbs(per sq. ft.)of cohesion <br /> and an intemal fiction angle of 23 degrees With this informabon Civil Solutions Group has <br /> designed the slope using 1.3 safely factor. <br /> This is acceptable. If the certainty of the soil parameters used for the design is considered to <br /> be sufficient,the use of a safety factor of 1.3 is at the discretion of the engineer. <br /> Re.Comment No. 3. This particular note has been revised to 18"LOW PERMEABLE SOIL <br /> (HYDRO SEED EROSION PR07EC77ONASPER CONTRACTOR SUBMITTAL). Itis understood <br /> by Civil Solutions Group brat the contractor has previously submitted the erosion protection <br /> plan. <br /> I have no information re: this submittal, and cannot comment on its acceptability. The <br /> erosion protection of the slope directly affects the stability of the slope,and the proposed <br /> design should be reviewed closely by those familiar with erosion protection of steep slopes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.