Laserfiche WebLink
PROJECT„x RINGERWOOD LI B2 "_ 'may <br /> LOCATION:ORONO,MINNESOTA <br /> PREPARED FOR:GONYEA HOMES,INC. <br /> PREPARED BY:SATHRE-BERGQUIST,INC. <br /> Unit Count 1 <br /> DATE:FEBRUARY 02,2017 <br /> REVISED: <br /> Estimated Unit Bid <br /> pescriotion Unit Quantity Price Amount <br /> Watemiain 6"C-900 PVC L.F. 12.0 <br /> Watemrain 8"C-900 PVC L.F. 420.0 <br /> Watemrain 10"C-906 DIPS(Boring under Willow Drive) L.F. 85.0 <br /> Connect to Existing(Wet Tap) EACH 1.0 <br /> 6"Valves EACH 1.0 <br /> 8"Valves EACH 1.0 <br /> Valve Box Adaptor II#6 Base-By Adaptor Inc.(On All 6"-12"GVs) EACH 2.0 <br /> 8"x 6"Tee EACH 1.0 <br /> 8"Bends EACH 1.0 <br /> 8"Plug w/Tail EACH 1.0 <br /> Hydrants(WB 67,5 ft back of curb) EACH 1.0 <br /> 0.5'Hydrant Extension EACH 1.0 <br /> 8"to 1"service saddle connection EACH 1.0 <br /> 1"services EACH 1.0 <br /> Improved Pipe Fndtn L.F. 517.0 <br /> Watermain Total: <br />