Laserfiche WebLink
PROJECT:RINGERWOOD L9 B2 <br /> LOCATION:ORONO,MINNESOTA <br /> PREPARED FOR:GONYEA HOMES,INC. <br /> PREPARED BY:SATHRE-BERGQUIST,INC. <br /> Unit Count 1 <br /> DATE:FEBRUARY 02,2017 <br /> REVISED: <br /> Estimated Unit Bid <br /> pescription Unit Quantity Pnce Amount <br /> S.'nmtarySewer- <br /> Mobilization-Utility L.S. 1.0 <br /> Permits&Bonds L.S. 1.0 <br /> 8"PVC SDR 35 0-15' L.F. 420.0 <br /> 10"SDR 11 IPS(Boring under Willow Drive) L.F. 85.0 <br /> Manhole 0-8' EACH 2.0 <br /> Furnish&Install Castings EACH 2.0 <br /> 8"x 4"Wyes(SCH.40) EACH 1.0 <br /> 4"PVC Service(SCH.40) EACH 1.0 <br /> PVC Cleanout EACH 1.0 <br /> 8"Boot w/Plug EACH 1.0 <br /> Improved Pipe Fndtn L.F. 505.0 <br /> Televise L.F. 505.0 <br /> Connect to Existing(Core Drill) EACH 1.0 <br /> Insulate(4x8x2 Sheets,2sheets) L.F. 0.0 <br /> Exterior Manhole Joint Wrap L.S. 0.0 <br /> Sanitary Sewer Total: <br />