Laserfiche WebLink
a 1 <br /> 19.9 Following completion of the curb and gutter construction, the CONTRACTOR shall <br /> backfill the curb and spread a minimum of 4" of topsoil on the boulevard area. Following the <br /> installation of the minor utilities (NSP, Northwestern Bell, Gas, ... etc.) the CONTRACTOR shall <br /> reshape the boulevard areas and sod three (3) feet behind the curb, between the curb and walk <br /> (trail) plus one roll outside of the walk/trail and install silt fence behind the blvd. sod, and seed <br /> and mulch all other disturbed areas as specified in the site grading section of the <br /> SPECIFICATIONS. <br /> 19.10 Following completion of the curb and gutter construction and the installation of the minor <br /> utilities (XCEL, Qwest, Minnegasco, Comcast, Electric, Cable TV, Gas, etc.) the <br /> CONTRACTOR shall regrade the boulevard areas and shall also reshape the overflow areas <br /> and EOF"s as designated on the Grading, Drainage, and Erosion Control Plan. <br /> 19.11 The City of Orono requires Neenah Foundry Company, East Jordan Works charcoal grey <br /> coated cast iron truncated dome panels for all pedestrian ramps. <br /> 20. SAFETY <br /> 20.1 The CONTRACTOR shall be solely responsible for the safe protection of the work and <br /> shall perform the work in accordance with the latest guidelines set forth by O.S.H.A. and the <br /> Department of Labor and Industry. <br /> 21. PERMITS <br /> 21.1 The CONTRACTOR shall be responsible for obtaining any required permits from the <br /> City for connections to existing municipal utilities or excavations in public right of way. The <br /> CONTRACTOR shall be responsible for all fees, bonding and proof of insurance required by the <br /> City. <br /> 22. GUARANTEE <br /> 22.1 The CONTRACTOR shall be required upon City Council acceptance of the work or a <br /> portion thereof to submit a maintenance bond in the amount of the work being accepted to the <br /> City of Orono guaranteeing that work to the City of Orono for a period of two (2) years from the <br /> date of acceptance. <br /> 23. CORRECTIONS <br /> The following are corrections to the general specifications and supercede the specification in <br /> question. <br /> 23.1 <br /> SP-9 <br />