My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00492 - ROW permit
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
701 Dickey Lake Drive - 34-118-23-22-0005
>
Permits/Inspections
>
2017-00492 - ROW permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:04 PM
Creation date
1/19/2018 12:19:50 PM
Metadata
Fields
Template:
x Address Old
House Number
701
Street Name
Dickey Lake
Street Type
Drive
Address
701 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18.3 In areas where the sewer is installed adjacent to building pad areas the CONTRACTOR <br /> will be required to meet site grading compaction specifications for building pad construction in <br /> the utility trench. <br /> 19. STREET CONSTRUCTION <br /> 19.1 All street work shall be completed in accordance with the City of Orono Standard Details. <br /> 19.2 Following utility installation, and prior to placement of aggregate base, the <br /> CONTRACTOR shall be required to reshape the street subgrade to provide for positive <br /> drainage so that water does not pond in any areas prior to placement of the granular base. The <br /> subgrade shall be graded to within +/- .1 ' of the proposed subgrade. The contractor will be <br /> required to perform a test roll prior to placement of Select Granular (MNDot 3149.2B2) and the <br /> Class 5 base (MNDot 3138 Al). <br /> 19.3 The aggregate base shall be class 5 base made up of 100% crushed virgin quarry stone <br /> meeting MnDOT Specification 3138 Al and installed in accordance with MnDOT Specification <br /> 2211 with compaction by the specified density method. The Contractor may use recycled class <br /> 5 base material if approved in writing by the City of Orono, prior to placement of any recycled <br /> material the CONTRACTOR shall provide the ENGINEER with a copy of the written approval <br /> letter. A manual plate tamper shall be used along the face of the curb. <br /> 19.4 The Bituminous Base Course shall be in accordance with MnDOT Specification 2360. A <br /> manual plate tamper shall be used along the face of the curb. <br /> 19.5 The Bituminous Wear Course shall be in accordance with MnDOT Specification 2360. <br /> A rubber tired roller is to be used on all wear course installed. <br /> 19.6 Prior to placement of the granular base, the CONTRACTOR shall notify the Engineer <br /> that the subbase is prepared. The subgrade shall then be toleranced to within +/- 1/4 inch of <br /> design grade. Upon approval of the grade the CONTRACTOR shall perform a test roll of the <br /> approved area. The test roll shall be done using a tandem truck with gross weight of 25 tons. A <br /> Soils Engineer shall be present during test rolling and provide written certification to the City that <br /> the test passed or necessary corrections or recommendations if the test failed. <br /> 19.7 Prior to placement of the aggregate base, all manhole and valve box castings shall be <br /> removed or lowered below the bottom of the aggregate level. Following construction of the first <br /> bituminous lift the CONTRACTOR shall adjust all the castings .5" below the first lift. <br /> Immediately prior to the construction of the final bituminous lift, the CONTRACTOR shall adjust <br /> all castings to their final elevation of one (1) inch below the final surface. The bid items for <br /> "Adjust Manhole Castings" and "Adjust Valve Box Castings" shall be compensation for all <br /> adjustments required to establish the finished grades for the tops of these structures. Ramping <br /> of manholes for snow plow protection will not be allowed. <br /> 19.8 The aggregate base, curb and gutter, and bituminous base surface shall be constructed <br /> by the CONTRACTOR during the 2017 Construction Season, following completion of the utility <br /> WORK. The bituminous wear course shall be installed in the 2017 construction season, as <br /> directed by the OWNER. The CONTRACTOR shall be responsible for the necessary street <br /> cleaning prior to placement of final Bituminous Surface. The CONTRACTOR shall be aware <br /> that the OWNER or Companies working for the OWNER will be building houses and or <br /> performing other construction activities in the immediate area and that the streets may need <br /> additional cleaning. The CONTRACTOR will also have to coordinate their work with the other <br /> people working in the area. <br /> SP-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.