shall be installed immediately after topsoil has been respread. No payment shall be released, to <br /> the CONTRACTOR, for any silt fence not properly installed. Upon the completion of the site <br /> grading, a site walk-thru will be completed with the OWNER and the ENGINEER to add <br /> additional silt fence and silt fence j-hooks to help eliminate potential erosion issues, payment will <br /> be made under the—silt fence after grading line item. <br /> 13.4 The CONTRACTOR shall notify the ENGINEER when a portion of the grading work is <br /> within tolerance for approval. All areas shall be checked and approved prior to the <br /> CONTRACTOR leaving the PROJECT site. <br /> 13.5 The grading CONTRACTOR shall be required to install drainage ways, ditches with rock <br /> checks or have installed the temporary drainage culverts shown on the Grading, Drainage and <br /> Erosion Control Plan to maintain drainage throughout the site during grading operations and <br /> upon site grading completion. <br /> 13.6 The Contractor doing the utility and street construction will be required to accept the <br /> responsibility of maintaining the accepted site as approved with the uniform 6" layer of topsoil. <br /> Any areas disturbed by the utility or street construction will have to be rechecked and verified at <br /> both the subgrade and top of topsoil prior to acceptance and final payment of the utility and <br /> street work. <br /> 13.7 The Contractors shall be required to stockpile on site at a location determined in the field <br /> by the Owner all boulders 12" or larger in diameter that are found on site. <br /> 13.8 The Contractor shall be responsible for the maintenance of all the silt fence and the <br /> costs for the maintenance and inspection will be paid for at the bid unit price. <br /> 13.9 The Contractor(Grading, Utility, and Street) will be responsible for maintaining all <br /> erosion control, BMP'S, and other storm water management items listed in the SWPPP through <br /> the completion of the grading, utility construction, street construction, installation of the minor <br /> utilities, and the establishment of the turf. The contractor shall sign the NPDES Permit as the <br /> co-permitee (Contractor). After the establishment of all turf, the contractor shall sign over the <br /> NPDES Permit to the Owner. Any Contractor or Contractor's Subcontractor will be considered <br /> a co-permitee and required to meet the NPDES Permit requirements and the SWPPP <br /> requirements. The Contractor shall be responsible for the SWPPP Inspections as part of <br /> the project Scope of Work. (see 13.11) <br /> 13.10 The Contractor shall be responsible for the cleaning of the sedimentation pond(s) two <br /> times. Once after the bituminous base course has been installed, and again after the wear <br /> course has been installed, prior to final acceptance. This item will be paid as a lump sum for <br /> cleaning all the ponds. The amount will be paid at the bid price regardless of the amount of <br /> sediment in the ponds. <br /> 13.11 The Contractor shall fill out the Inspection and Maintenance Report(Project Log) each <br /> week and/or within 24 hours after any rainfall greater than 0.5 inches. The Contractor shall <br /> submit the log (electronic copy, be email) to the Engineer each week and a monthly summary <br /> and with any payment request. One copy of the Report must remain on site at all times, in <br /> accordance with the rules outlined in the storm water permit. Payment will not be authorized for <br /> any work until these forms are complete and reviewed by the engineer. <br /> 13.12 The Contractor shall provide the Engineer the Original Report and a copy prior to final <br /> acceptance or transfer of ownership to a different permitee. <br /> 13.13 All restoration shall be done in accordance with MnDot seeding specifications. Prior to <br /> restoration, all seed mixtures shall be verified to be the proper seasonal mixture. <br /> SP-5 <br />