Laserfiche WebLink
223) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24) 5 percent site slope (0-20% range) 5 (% downslope site slope, if different than upslope) <br /> 25) 12 inches, or 1.0 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains 0 inches of 0% soil credit, and 0 inches of 50% soil credit. Giving a: <br /> 26) 24 inch, or 2.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br /> 29) 4:1 upslope ratio 13 ft. upslope berm <br /> 30) 4:1 sideslope 18 ft. sideslope berms <br /> 31) 4:1 downslope 23 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br /> 46 ft. wide by 99 ft. long Mound footprint <br /> 4' inspection pipe <br /> 18" cover on top <br /> {Upslope berm 13 Downslope berm 23 } <br /> d 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> 2.0 Clean sand lift <br /> 1.0 1 � <br /> Absorption Width 127.0 <br /> Note_ : <br /> For 0 to 1% slopes, Absorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by 9 inches under pipe, plus 20%gives 28 yd'or*1.4= 39 ton <br /> 34) Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 50.5 up + 103.2 downslope + 18.1 ends + 52.5 under rock = 269 yd3 or*1.4= 377 ton <br /> plus 20% <br /> 35) Loamy Cap: <br /> 42 ft. by 95 ft. 6" deep, plus 20%gives 89 yd'or*1.4= 125 ton <br /> 36) Topsoil: <br /> 46 ft. by 99 ft. 6"deep, plus 20%gives 102 yd'or*1.4= 143 ton <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> 12/12/2017 <br /> Desi ner Signature mpany License# Date <br />