My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic Design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
1/17/2018 10:48:19 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
223) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24) 5 percent site slope (0-20% range) 5 (% downslope site slope, if different than upslope) <br /> 25) 12 inches, or 1.0 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains 0 inches of 0% soil credit, and 0 inches of 50% soil credit. Giving a: <br /> 26) 24 inch, or 2.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br /> 29) 4:1 upslope ratio 13 ft. upslope berm <br /> 30) 4:1 sideslope 18 ft. sideslope berms <br /> 31) 4:1 downslope 23 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br /> 46 ft. wide by 99 ft. long Mound footprint <br /> 4' inspection pipe <br /> 18" cover on top <br /> {Upslope berm 13 Downslope berm 23 } <br /> d 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> 2.0 Clean sand lift <br /> 1.0 1 � <br /> Absorption Width 127.0 <br /> Note_ : <br /> For 0 to 1% slopes, Absorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by 9 inches under pipe, plus 20%gives 28 yd'or*1.4= 39 ton <br /> 34) Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 50.5 up + 103.2 downslope + 18.1 ends + 52.5 under rock = 269 yd3 or*1.4= 377 ton <br /> plus 20% <br /> 35) Loamy Cap: <br /> 42 ft. by 95 ft. 6" deep, plus 20%gives 89 yd'or*1.4= 125 ton <br /> 36) Topsoil: <br /> 46 ft. by 99 ft. 6"deep, plus 20%gives 102 yd'or*1.4= 143 ton <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> 12/12/2017 <br /> Desi ner Signature mpany License# Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.