My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: shared driveway
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
3768 North Shore Drive- 08-117-23-34-0063
>
Correspondence
>
Re: shared driveway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:46:38 PM
Creation date
12/7/2017 1:55:18 PM
Metadata
Fields
Template:
x Address Old
House Number
3768
Street Name
North Shore
Street Type
Drive
Address
3768 North Shore Dr
Document Type
Correspondence
PIN
0811723340063
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Don Debaere <br /> From: Johnson, Paula J [paula.johnson�nwa.comj <br /> Sent: Monday, November 17, 2008 12:23 PM <br /> To: Don Debaere; Evelyn M.Turner; Lyle Oman <br /> Subject: 3818 N Shore Dr Driveway dilemma <br /> I need clarification and diredion on the development of my driveway. I have received conflicting information and <br /> constantly changing requirements. Every time I think I have performed all of the stated requirements, I get shut <br /> down and another hurdle tossed my way.The first time it was that I had to have a surveyor out to define the east <br /> edge of my properly-an extra$350. Then I was told I need an engineering quality drawing-an extra$500. Now <br /> the driveway project has turned into a road-building project according to the latest requirement change. What was <br /> a$3000-$5000 cost has increased to$15,000-$20,000. I have already invested over$1,000 and have absoiutety <br /> nothing but a survey stake and road plan on a piece of paper for the trouble. Not to rr�ention many, many hours of <br /> my time and the entire driveway building season gone. <br /> 1)Why has a driveway plan morphed into a new aty street for Orono?If I build a street,will the public be able to <br /> use it?Will Orono maintain it-and the snow rerr�oval and general maintenance? <br /> 2) How will the city ensure that both homeowners pay their fair share?When other streets are built in Orono, are <br /> the homeowners assessed for the entire cost?How is it divided and billed?This is now beyond my means to <br /> finance the neighbor's portion and yet you require the excavation be done in one session. <br /> 3)Why was this requirement sprung on me at the last moment'? I have followed all of Evelyn's letters and <br /> requests and no where did it say the driveway had to be developed using street-building specs.Who added this <br /> requirement and why?Under what authority? <br /> 4) If I do nothing,what will you require from the Blairs?How will you enforce it? <br /> I had another very close call last Fri trying to pull out of my driveway.All I am trying to accompUsh is a safe <br /> driveway wide enough for iwo vehicles and with adequate sight lines.Why has this turned into such a difficuft <br /> battle? It would've been simplest if from the start you would have vacated the land and allowed us to each build <br /> our own driveway under the rules of Hennepin County access. <br /> 11/18/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.