Laserfiche WebLink
Page 1 of 1 <br /> Don Debaere <br /> From: Evelyn M. Turner <br /> Sent: Monday, November 17, 2008 12:32 PM <br /> To: Soren Mattick <br /> Cc: Lyle Oman; Don Debaere <br /> Subject: FW: 3818 N Shore Dr Driveway dilemma <br /> I think we have a duck problem, tt will be in a dedicated right of way. It will look like a street. It will be constructed like a <br /> street. It will work like a street. I think it is a street. <br /> I'm out of this. <br /> ET <br /> From:Johnson, Paula J [mailto:paula.johnson@nwa.com] <br /> Sent: Monday, November 17, 2008 12:23 PM <br /> To: Don Debaere; Evelyn M.Tumer; Lyle Oman <br /> Subject: 3818 N Shore Dr Driveway dilemma <br /> I need clarification and direction on the development of my driveway. I have received conflicting information and constantly <br /> changing requirements. Every time I think I have pertormed all of the stated requirements, I get shut down and another <br /> hurdle tossed my way. The first time it was that I had to have a surveyor out to define the east edge of my property-an extra <br /> $350. Then I was told I need an engineering quality drawing-an extra$500. Now the driveway project has turned into a <br /> road-building project according to the latest requirement change.What was a$3000-$5000 cost has increased to$15,000- <br /> $20,000. I have already invested over$1,000 and have absolutely nothing but a survey stake and road plan on a piece of <br /> paper for the trouble. Not to mention many, many hours of my time and the entire driveway building season gone. <br /> 1)Why has a driveway plan morphed into a new city street for Orono?If I build a street,will the public be able to use it?Will <br /> Orono maintain it-and the snow removal and general maintenance? <br /> 2) How will the city ensure that both homeowners pay their fair share?When other streets are built in Orono, are the <br /> homeowners assessed for the entire cost? How is it divided and billed?This is now beyond my means to finance the <br /> neighbor's portion and yet you require the excavation be done in one session. <br /> 3)Why was this requirement sprung on me at the last moment?I have followed all of Evelyn's letters and requests and no <br /> where did it say the driveway had to be developed using street-building specs. Who added this requirement and why? Under <br /> what authority? <br /> 4) If 1 do nothing,what will you require from the Blairs? How will you enforce it? <br /> I had another very close call last Fri trying to pull out of my driveway.All I am trying to accomplish is a safe driveway wide <br /> enough for two vehides and with adequate sight lines.Why has this turned into such a difficult battle?It would've been <br /> simplest if from the start you would have vacated the land and allowed us to each build our own driveway under the rules of <br /> Hennepin County access. <br /> 11/18/2008 <br />