My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2016 Council Packet
Orono
>
City Council
>
2016
>
12-12-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 3:39:29 PM
Creation date
11/28/2017 3:58:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
685
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recommendations and Cost Estimates — Water System: <br />Recommendations are given below to bring the system up to current technology and to provide <br />enhanced features. The recommendations are based on newer operating installations at many other <br />Minnesota municipalities. These recommendations are also based on hardware and software products <br />that have proven to be reliable at other installations, and have significant market share. Products with <br />large market share have more "momentum" and lower chance of obsolescence, resulting in a longer <br />project life -cycle. <br />The following recommendations are also intended to meet the City's goal of budgeting for a multi-year <br />project. The recommendations are given in order of importance. <br />Recommended Proiect No. 1— UDearade Wellhouse 3 SCADA: <br />Wellhouse 3 has recently received new chemical storage and feed equipment, and is receiving <br />new submersible Well 4. This site may also receive a new generator and transfer switch in the <br />future. The existing SCADA panel at Wellhouse 3 is obsolete and cannot be expanded to include <br />control and monitoring of the new chemical feed equipment or well 4. <br />A new, larger PLC -based panel is recommended. An Allen-Bradley (Rockwell Automation) <br />"CompactLogix" PLC is the current product recommendation. The new panel should include <br />added inputs/outputs for all of the site equipment, plus space/spares for known future <br />equipment. <br />Estimated project costs are provided below: <br />RECOMMENDED PROJECT NO. 1 - UPGRADE WELLHOUSE 3 SCADA <br />q <br />Description <br />Unit <br />Each <br />Quantity <br />Extension <br />1 <br />Mobilization <br />LS <br />$ <br />2,000.00 <br />1 $ <br />2,000.00 <br />2 <br />Shop drawings, technical submittals <br />LS <br />$ <br />6,000.00 <br />1 $ <br />6,000.00 <br />3 <br />New PLC -based SCADA panel <br />EA <br />$ <br />30,000.00 <br />1 $ <br />30,000.00 <br />4 <br />Temp. revisions to existing SCADA software (not required if coincident with Project 2) <br />LS <br />$ <br />6,000.00 <br />1 $ <br />6,000.00 <br />5 <br />Startup, checkout services, test 1/0 <br />LS <br />$ <br />4,000.00 <br />1 $ <br />4,000.00 <br />6 <br />Cable, conduit, installation <br />LS <br />$ <br />5,000.00 <br />1 $ <br />5,000.00 <br />7 <br />Training and demonstration services I <br />LS <br />1 $ <br />3,000.00 <br />1 1 $ <br />3,000.00 <br />SUBTOTAL <br />$ <br />56,000.00 <br />CONTINGENCY (2W.) <br />$ <br />11,200.00 <br />TOTAL CONSTRUCTION COST <br />$ <br />67,200.00 <br />N OTES: <br />(1) City of Orono internal costs are not included. <br />(2) Engineering, legal and administrative costs are not included. <br />Page 7 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.