My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2016 Council Packet
Orono
>
City Council
>
2016
>
12-12-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 3:39:29 PM
Creation date
11/28/2017 3:58:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
685
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Typical New Lift Station Panels: <br />New control panels have been installed at several lift stations. The panels have been provided by <br />Quality Controls and Integration (QCI), and include a QCI "1500ct" pump controller. The pump <br />controller provides level setpoint control of the pumps, automatic pump alternation, and several other <br />features typically found in a duplex pump station. The 1500ct controller is also capable of SCADA <br />communication. <br />The City is in the process of systematically replacing old lift station controls with the new QCI panels. <br />The City has 46 lift stations, and this process will take several years. <br />New Lift Station Control Panel with QCI Controller <br />Page 6 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.