My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-2016 Council Packet
Orono
>
City Council
>
2016
>
11-14-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:45:36 PM
Creation date
11/28/2017 3:30:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q&BOLT <br />MENOK <br />Real People. Real Solutions. <br />October 31, 2016 <br />City of Orono <br />Attn: Adam Edwards <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />RE: North Arm Drive Trail <br />Preliminary Engineering Report Proposal <br />Dear Mr. Edwards: <br />2638 Shadow Lane <br />Suite 200 <br />Chaska, MN 55318-1172 <br />Ph: (952) 448--8838 <br />Fax: (952) 448--8805 <br />Bolton-Menk.com <br />As requested we have performed a preliminary analysis of a proposed trail along North Arm Drive from <br />West Branch to the Lakeview Parking lot, approximately 2,300 feet long. <br />Our initial estimates place the cost of constructing this trail to be on a range of approximately $155,000- <br />$230,000 (total project costs, including engineering and administration) <br />We propose to prepare and deliver a Preliminary Engineering Design Report that includes: <br />1. Recommend a width and placement for the proposed trail <br />2. Identify cost effective construction materials <br />3. Further analyze the need for retaining walls <br />4. Avoid points of conflict with existing utilities and power poles <br />5. Establish a budget for both Construction Costs and to perform final design <br />Bolton & Menk Inc. Proposes to prepare and deliver the above described Preliminary Engineering Design <br />Report at an Hourly, Not to Exceed Fee of $3,000. <br />Sincerely, <br />Bolton & Menk, Inc. <br />.000 <br />Brian D Simmons, P.E. <br />Project Manager <br />H:\ORNO\2016-10-31 North Arm Trail Proposal.docx <br />Bolton & Menk is ap equal opportunity emptoyer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.