My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I NIA <br />K. Lots 1, 2, and 3 each contain suitable area meeting all established setback <br />requirements to allow the construction of single family residences. Principal structure setbacks <br />shall adhere to the required setbacks of the underlying LR -1A Zoning District. <br />L. The Developer shall pay to the City the amounts incurred for the <br />preparation of record construction drawings and City base map upgrading. <br />M. The Developer shall submit the final Plat in electronic format. The Plat <br />shall be created using Hennepin County Coordinates. The electronic format shall be Auto CAD <br />file. The Developer shall also submit two complete sets of the Plat on Mylar (one copy for the <br />City's records and one copy for recording with Hennepin County). The Developer shall also <br />provide one copy reduced to 1" = 200'. <br />N. N/A <br />0. N/A. <br />P. Retaining walls that require a building permit shall be constructed in <br />accordance with plans and specifications prepared by a structural or geotechnical engineer <br />licensed by the State of Minnesota. Following construction, a certification signed by the design <br />engineer shall be filed with the City Engineer evidencing that the retaining wall was constructed <br />in accordance with the approved plans and specifications. All retaining walls required to be <br />constructed by the Plans, or special conditions referred to in this Contract, shall be constructed <br />before any Certificate of Occupancy is issued for a lot on which a retaining wall is required to be <br />built. <br />14 <br />Tanager Estates-vl-mpg-2/23/16 <br />14 <br />Tanager Estates-vl-mpg-2/23/16 <br />1893390 <br />189339v3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.