My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NCs <br />2638 Shadow Lane, Suite 200 • Chaska, MN 55318-1172 <br />Phone (952) 448-8838 • Fax (952) 448-8805 <br />www.bolton-menk.com <br />September 30, 2016 <br />City of Orono <br />Attn: Mike Gaffron <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />RE: Final Plat Application 16-3867 <br />Tanager Estates <br />Engineering Review #1 <br />Dear Mike: <br />As requested, we have completed an engineering review of the documents submitted for the above <br />referenced project. We offer the following comments for your consideration: <br />General <br />Council <br />Exhibit G <br />1.1. Stormwater management for the proposed site meets City requirements. Proposed peak runoff rates <br />will be restricted to less than existing peak runoff rates, and volume control will be provided in <br />accordance with NPDES requirements. <br />1.2. A final estimated cost of proposed improvements, matching approved plans, must be submitted in <br />order to determine the total Letter of Credit (LOC) amount. The LOC must be written to 150% of cost <br />of improvements and submitted prior to any land disturbing activities. Estimated costs should include <br />grading, erosion control, utilities, street construction, vegetation management, buffer establishment, <br />temporary stabilization, and final stabilization. <br />1.3. The minimum escrow of $10,000 should be submitted prior to any land disturbing activities to provide <br />for erosion control and engineering oversight. <br />1.4. Retaining walls are proposed to be just under 4' in height. However, if wall heights are increased in <br />field to over 4' in height to match unknown site conditions, walls must be analyzed by a licensed <br />Professional Engineer, and an approval letter of wall design and construction must be provided. <br />1.5. Due to close proximity to the road, fence should be provided along the proposed retaining walls to <br />provide some measure of safety for pedestrian traffic. <br />1.6. Clear drive lanes must be maintained on Heritage Drive during construction. The Contractor will have <br />to exercise care during mobilization of equipment to not block traffic, and parking for construction <br />workers should be restricted to on-site only. The Contractor should submit a Traffic Control Pian prior <br />to any work. Plan must account for all items listed in Condition 8 of the Preliminary Plat approval <br />resolution in order to define acceptable construction activity and traffic control on Heritage Lane. <br />1.7. A Final Landscape Plan should be submitted as part of the Final Plat process. The plan should indicate <br />various items with a legend and hatching to ensure areas of management and revegetation are <br />adequately accounted for. The plan should include the following within the area of proposed <br />improvements: <br />a. Tree preservation and removal limits, including tree protection fencing <br />b. Tree replacement locations and species schedule <br />c. Invasive species removal <br />d. Wetland buffer establishment <br />e. Vegetation establishment for disturbed areas <br />1.8. The Lot Declarations should take into account the following items: <br />
The URL can be used to link to this page
Your browser does not support the video tag.