Laserfiche WebLink
� SECTION 16010 <br /> GENERAL CONDITIONS <br /> � <br /> 1.00 GENERAL <br /> � A. General and Supplementary conditions within Division 1 are hereby incorporated and <br /> become part of these Specifications, covering all work in Division 16000, Electrical. <br /> � B. Contractors shall familiarize themselves with all Architectural, Structural and <br /> Mechanical Drawings and Specifications. These Drawings and Specifications, as they <br /> affect the electrical installation, shall become part of Division 16000 Contract <br /> � Documents. <br /> C. The Electrical Drawings and Specifications shall form a set of Plans for the electrical <br /> � work. Neither the Drawings nor the Specifications shall be complete without the other. <br /> Any item shown on the Drawings or specified in the Specifications shall be considered <br /> as shown and specified on both. <br /> � D. Any questions regarding the intent of the Drawings or Specifications shall be brought to <br /> the Engineer's attention as soon as possible. If direcrion from the Engineer cannot be <br /> obtained due to time or communication limitations, the greater quantity, higher qualiry <br /> � or condition most favorable to the Owner shall be assumed. <br /> 1. The drawings and specifications are complementary to one another. If anything is <br /> shown on the drawings or specified in the specifications it shall be considered to <br /> � be in both and included in the contractors bid. <br /> E. Electrical Drawings are diagrammaric and are intended to show approximate locations <br /> only. The Contractor shall thoroughly review all Architectural, Structural and <br /> ' Mechanical Drawings and Specifications. Placement of electrical equipment and <br /> devices shall not interfere with locations or clearances of other trades' materials or <br /> equipment. Contractor shall submit a 1/4" scale drawing to the Engineer for approval <br /> � of all electrical rooms indicating placement of all mechanical and electrical equipment. <br /> F. The following terms used in the Drawings and Specifications shall be defined as <br /> follows: <br /> � 1. Contractor: Shall mean Electrical Contractor or any of their Subcontractors. <br /> 2. Work: Shall mean labor and/or materials of the Electrical Contractor or any of <br /> their Subcontractors. <br /> � 3. Furnish: Shall mean purchase, submit for Engineer approval, coordinate with <br /> Contract Documents and deliver to site in new, undamaged condition. <br /> �. Install: Shall mean to schedule for delivery, deliver or have delivered to the site, <br /> � store as directed, protect from damage, set in place, make all necessary final <br /> connections, test as required and turn over to the Owner in full operaring <br /> condition. <br /> 5. Provide: Shall mean furnish and install. <br /> � 6. Connect: Shall mean to bring electrical service and/or control wiring to <br /> equipment, make all final connections, provide all necessary miscellaneous <br /> materials required and do final check out to ensure proper equipment connections. <br /> , G. The Contractor shall visit the site and familiarize themselves with the conditions <br /> effecting Division 16000 work. No additional costs to the Owner shall be allowed for <br /> items verifiable during site visits. <br /> � <br /> � RMAS CBA701 8/1/97 <br /> 032497 16010- 1 <br /> � <br />