My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Renovate/addition project manual-1997
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2625 North Shore Drive - 09-117-23-42-0003
>
Misc
>
Renovate/addition project manual-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:23 PM
Creation date
10/19/2017 12:55:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2625
Street Name
North Shore
Street Type
Drive
Address
2625 North Shore Dr
Document Type
Misc
PIN
0911723420003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � <br /> WOODHOUSE RESIDENCE <br /> � <br /> C. Identify and flag known utility locations . Notify utility <br /> company to remove and relocate utilities . <br /> �; <br /> D. Maintain and protect existing utilities to remain. <br /> E. Verify foundation or basement walls are braced to support ,� <br /> surcharge forces imposed by backfilling operations . <br /> 3 . 02 TOPSOIL EXCAVATION <br /> � <br /> A. Do not excavate wet topsoil . <br /> B. Excavate topsoil and stockpile in area on site. ! <br /> 3 . 03 SUBSOIL EXCAVATION <br /> A. Excavate subsoil required for building foundations, � <br /> construction operations, and other Work. <br /> B. Slope banks to angle of repose or less, until filled. � <br /> C. Excavation shall not interfere with 45 degree bearing splay <br /> of any foundation. �' <br /> D. Correct unauthorized excavation at no extra cost to Owner. <br /> E. Remove excess subsoil not being reused from site. � <br /> 3 . 04 TRENCHES � <br /> A. Excavate for sanitary sewer, water, gas piping to municipal <br /> utilities as required. <br /> B. Cut trenches sufficiently wide to enable installation of , <br /> utilities and allow inspection. <br /> C. Backfill trenches to required contours and elevations . � <br /> D. Place and compact fill materials as for Backfilling. � <br /> 3 . 05 BACKFILLING <br /> A. Backfill areas to contours and elevations . Use unsaturated � <br /> materials . <br /> B. Backfill systematically, as early as possible, to allow � <br /> maximum time for natural settlement. Do not backfill over <br /> porous, wet, frozen, or spongy subgrade surfaces . <br /> C. Place and compact fill materials in continuous layers not � <br /> ,� exceeding 6 inches loose depth. <br /> � <br /> � <br /> EARTHWORK - 02200-2 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.