Laserfiche WebLink
� - . <br /> WOODHOUSE RESIDENCE <br /> � <br /> SECTION 02200 <br /> � EARTHWORK <br /> PART 1 GENER.AL <br /> � 1 . 01 SECTION INCLUDES <br /> � A. Site grading, removal of topsoil and subsoil, building <br /> excavating and trenches, backfilling and compacting. <br /> � PART 2 PRODUCTS <br /> 2 . 01 SOIL MATERIALS <br /> � A. Topsoil:_ Reusable ,excavated: friable ,loam;_ free of__subsoil, <br /> roots, grass, excessive amount of weeds, large stone, and <br /> foreign matter. <br /> � B. Subsoil: Excavated material, graded free of lumps larger <br /> than 3" , rocks larger than 1 inche, and debris . <br /> � 2 . 02 FILL MATERIAI�S <br /> A. Type A - Coarse gravel : Crushed, washed; free of shale, <br /> � clay, friable material, sand, debris; graded within the <br /> following limits: <br /> 1 . Minimum Size: 1/2 inch <br /> � 2 . Maximum Size: 1 inch <br /> B. Type B - Pea Gravel. Natural stone; washed, free of clay, <br /> shale, organic matter; <br /> � 1 . Minimum Size: 1/4 inch <br /> 2 . Maximum Size: 5/8 inch <br /> C. Type C - Sand: Natural river or bank sand; washed; free of <br /> � silt, clay, loam, friable or soluble materials, and organic � <br /> matter. <br /> � D. Type D - Subsoil : Reused, free of rock larger than 3 and <br /> debris. <br /> , PART 3 EXECUTION <br /> � 3 . 01 EXAMINATION AND PREPARATION <br /> A. Identify required lines, levels, contours, and datum. <br /> � B. Notify Architect of unexpected subsurface conditions and <br /> discontinue affected work in area until notified to resume <br /> • ' work. <br /> ., <br /> � <br /> � EARTHWORK - 02200-1 <br />