My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Renovate/addition project manual-1997
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2625 North Shore Drive - 09-117-23-42-0003
>
Misc
>
Renovate/addition project manual-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:23 PM
Creation date
10/19/2017 12:55:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2625
Street Name
North Shore
Street Type
Drive
Address
2625 North Shore Dr
Document Type
Misc
PIN
0911723420003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> WOODHOUSE RESIDENCE <br /> 1 . 09 CONSTRUCTION PROGRESS SCHEDULES <br /> � <br /> A. Submit initial progress schedule in duplicate within 15 � <br /> days after date of Owner-Contractor Agreement for <br /> Construction Manager review. <br /> B. Submit revised schedules with each Application for Payment, � <br /> to Construction Manager, identifying changes since previous <br /> version. Iridicate estimated percentage of completion for <br /> each item of Work at each submission. � <br /> C. Submit a horizontal bar chart with separate line for each <br /> section of Work, identifying first work day of each week, � <br /> to Construction Manager review. <br /> 1 . 10 SHOP DRAWINGS ,� <br /> A. Submit the number of opaque reproductions which Contractor <br /> requires, plus two copies which will be retained by <br /> Architect & Construction Manager. � <br /> 1 . 11 MANUFACTURERS' INSTRUCTIONS <br /> A. Submit manufacturers' printed instructions for delivery, � <br /> storage, assembly, installation, start-up, adjusting, and <br /> finishing, for Product Data. � <br /> 1 . 12 MANUFACTURER'S CERTIFICATES <br /> A. When specified in individual specification Sections, submit � <br /> manufacturers' certificate to Construction Manager for <br /> review, in quantities specified for Product Data. <br /> B. Indicate material or Product conforms to or exceeds � <br /> specified requirements . Submit supporting reference data, <br /> affidavits, and certifications as appropriate. � <br /> 1 . 13 TEMPORARY ELECTRICITY <br /> A. Connect to existing power service. Power consumption shall � <br /> not disrupt Owner's need for continuous service. Owner to <br /> pay for power consumed. <br /> B. Provide power outlets for construction operations, branch � <br /> wiring, distribution boxes, and flexible power cords as <br /> required. <br /> � <br /> � <br /> � <br /> BASIC REQUIREMENTS-01001-4 8/97 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.