Laserfiche WebLink
� <br /> WOODHOUSE RESIDENCE <br /> 1 . 09 CONSTRUCTION PROGRESS SCHEDULES <br /> � <br /> A. Submit initial progress schedule in duplicate within 15 � <br /> days after date of Owner-Contractor Agreement for <br /> Construction Manager review. <br /> B. Submit revised schedules with each Application for Payment, � <br /> to Construction Manager, identifying changes since previous <br /> version. Iridicate estimated percentage of completion for <br /> each item of Work at each submission. � <br /> C. Submit a horizontal bar chart with separate line for each <br /> section of Work, identifying first work day of each week, � <br /> to Construction Manager review. <br /> 1 . 10 SHOP DRAWINGS ,� <br /> A. Submit the number of opaque reproductions which Contractor <br /> requires, plus two copies which will be retained by <br /> Architect & Construction Manager. � <br /> 1 . 11 MANUFACTURERS' INSTRUCTIONS <br /> A. Submit manufacturers' printed instructions for delivery, � <br /> storage, assembly, installation, start-up, adjusting, and <br /> finishing, for Product Data. � <br /> 1 . 12 MANUFACTURER'S CERTIFICATES <br /> A. When specified in individual specification Sections, submit � <br /> manufacturers' certificate to Construction Manager for <br /> review, in quantities specified for Product Data. <br /> B. Indicate material or Product conforms to or exceeds � <br /> specified requirements . Submit supporting reference data, <br /> affidavits, and certifications as appropriate. � <br /> 1 . 13 TEMPORARY ELECTRICITY <br /> A. Connect to existing power service. Power consumption shall � <br /> not disrupt Owner's need for continuous service. Owner to <br /> pay for power consumed. <br /> B. Provide power outlets for construction operations, branch � <br /> wiring, distribution boxes, and flexible power cords as <br /> required. <br /> � <br /> � <br /> � <br /> BASIC REQUIREMENTS-01001-4 8/97 � <br />