My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Renovate/addition project manual-1997
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2625 North Shore Drive - 09-117-23-42-0003
>
Misc
>
Renovate/addition project manual-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:23 PM
Creation date
10/19/2017 12:55:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2625
Street Name
North Shore
Street Type
Drive
Address
2625 North Shore Dr
Document Type
Misc
PIN
0911723420003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> WOODHOUSE RESIDENCE <br /> � 1 . 05 COORDINATION <br /> � A. Coordinate scheduling, submittals, and Work of the various <br /> Sections of specifications to assure efficient and orderly <br /> sequence of installation of interdependent construction <br /> � elements . <br /> B. Verify utility requirement characteristics of operating <br /> � equipment are compatible with building utilities. <br /> C. Coordinate space requirements and installation of <br /> mechanical and electrical work which are indicated on <br /> Drawings . Follow routing shown for pipes, ducts, and <br /> conduit, as closely as practicable. <br /> ,� . D. In finished areas, conceal pipes,, ducts, and wiring within <br /> the construction. <br /> 1 . 06 FIELD ENGINEERING <br /> , A. Establish elevations, lines, and levels and certify that <br /> elevations and locations of the Work conform with existing <br /> � conditions as closely as possible, unless specifically <br /> noted on drawings . <br /> � 1 . 07 CUTTING AND PATCHING <br /> A. Fit Work tight to adjacent elements. Maintain integrity of <br /> wall, ceiling, or floor construction; of adjacent building <br /> � areas to remain as exists . <br /> B. Refinish surfaces to match adjacent finishes . <br /> � 1 . 08 SUBMITTAL PROCEDURES <br /> � A. Submittal form to identify Project, Contractor, <br /> Subcontractor or supplier; and pertinent Contract Document <br /> references . <br /> � B. Apply Contractor's stamp, signed or initialled, certifying <br /> that review, verification of Products required, field <br /> dimensions, adjacent construction Work, and coordination of <br /> � information is in accordance with the requirements of the <br /> Work and Contract Documents . <br /> � C. Identify variations from Contract Documents and Product or <br /> system limitations which may be detrimental to successful <br /> performance of the completed Work. <br /> � D. Revise and resubmit submittals as required; identify all <br /> changes made since previous submittal . <br /> � <br /> � BASIC REQUIREMENTS-01001-3 8/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.