My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> , <br /> circumstances warrant; at no additional cost to Qwner and as accepted by Architect. � , <br /> Laboratory test data for revised mix design and strength results must be submitted to <br /> and accepted by Architect before using in woric. <br /> Admixtures: � <br /> Use air-entrainin� admixture in exterior exposed concrete, unless otherwise indicated. ' <br /> Add air-entraining admixture at manufacturer's prescribed rate to result in concrete at <br /> point of placement having total air content with a tolerance of plus-or-minus 1-1/2 <br /> percent within following limits: . , � <br /> S.0 - 7.096 by volune as determined by ASTM C231., <br /> Slump Limits: Proportion and design mixes to result in concrete slump at point of <br /> placement as follows: . , <br /> � Reinforced Foundation Systems: Not less than 1" and not more than 3". � <br /> Other Concrete: Not less than 1" and not more than k". <br /> 2;05 CONCRETE MIXING: , <br /> Job-Site Mixin�: Mix materials for concrete in appropciate drum type batch machine <br /> mixer. For mixers of one cu. yd., or smaller capacity, continue mixing at least 1-1/2 � <br /> minutes, but not more than S minutes aftec ingredients are in mixer, before any part of <br /> batch is released. For mixers of capacity larger than one cu. yd., increase minimum 1- <br /> 1/2 minutes of mixing time by 1S seconds for each additional cu. yd., oc fraction thereof. � <br /> Provide batch ticket for each batch discharged and used in work, indicating project <br /> identification name and number, date, mix type, mix time, quantity, and amou�t of , <br /> water introduced. � <br /> Ready-Mix Concrete: Comply with requirements of ASTM C 94, and as herein specified. <br /> During hot weather, or under conditions contributing to rapid setting of concrete, a , <br /> shorter mixing time than specified in ASTM C 94 may be required. <br /> PART 3 - EXECUTION , <br /> 3.01 GENERAL: <br /> Coordinate the installation of joint materials and vapor retarders with placement of � <br /> forms and reinforcing steel. <br /> , 3.02 FORMS: � <br /> Desi�n, erect, suppo�t, brace and maintain formwork to support vertical and laterial <br /> loads that might be applied until such loads can be supported by concrete structure. ( <br /> CONCRETE WORK 03310 - 4� <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.