My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> General: Control soil compaction during construction providing minimum percentage of � <br /> d.ensity specif ied for each area classif ication indicated below. <br /> Percenta�e of titaximum Density Requirements: Compact soil to not less than the � <br /> following percentaRes of maximum density for soils which exhibit a well-defined <br /> moisture density relationship (cohesive soils) determined in accocdance with ASTM D <br /> 1557; and not less than the following percentaqes of relative density, determined in � <br /> accordance with ASTM D 2049, for soils which will not exhibit a well-defined moisture- <br /> density relationship (cohesionless soils). <br /> Structure, BuildinQ Slas and Steps, Pavements: Compact in 8" lifts to an average � <br /> 9896 and a minimum 9596 maximum density. <br /> Lawn or Unpaved Areas: COmpact in 8" lifts to 9096 maxiiYium density for <br /> cohesive soils. . ' <br /> Pavements: Compact in 8" lifts to an average 9596 and a minimum 9296 maximum <br /> density. , <br /> Moisture Control: Where subgrade or layer of soil material must be moisture conditioned <br /> before compaction, uniformly apply water to surface of subgrade, or layer of soil � <br /> material, to prevent free water appearing on surface during or subsequent to compaction <br /> operations. <br /> Remove and replace, o� scarify and air� dry, soil material that is too wet to permit � <br /> compaction to specified density. <br /> Soil material that has been removed because it is too wet to permit compaction ' <br /> may be stockpiled or spread and allowed to dry. Assist drying by discing, harrowing <br /> or pulverizing until moisture content is reduced to a satisfactory value. <br /> 3.03 BACKFILL AND FILL: � 1 <br /> General: Place acceptable soil material in layers to required subgrade elevations, for <br /> each area classification listed below. � <br /> In excavations, use satisfactory excavated or borrow material. • <br /> Under ttrassed areas, use satisfactory excavated or borrow material. , <br /> Under walks and pavements, use subbase material, or satisfactory excavated or <br /> borrow material, or combination of both. � <br /> Under steps, use subbase material. <br /> Under building slabs, use drainage fill material. � <br /> Under pipin� and conduit, use subbase material where subbase is indicated under <br /> piping or. conduit; shape to fit bottom 90 degrees of cylinder. � <br /> EARTHWORK 02200 - 6 <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.