My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ __ _. -� .,y:.a�. ;_. ..�__. <br /> :-........ _.-.�, <br /> ' <br /> ' <br /> ' , <br /> Satisfactory soil materials are defined as those complying with AST1�A D2487 soil <br /> � classification groups GW, GP, G1rt, SM, SW and SP. <br /> Unsatisfactory soil materials are defined as those complying with ASTM D2487 soil <br /> classification groups GC, SC, ML, MH, CL, CH, OL, OH and PT. <br /> ' � Subbase Material: l0096 class 5 crushed aggregate. <br /> ' Drainaqe Fill: Washed, evenly graded mixture of crushed stone, or crushed or uncrushed <br /> gravel, with 10096 passing a 1-112" sieve and not more than 596 passing a No. 4 sieve. <br /> Backfill and Fill Materials: Satisfactory soil materials free of clay, rock or gravel larger <br /> ' than 2" in any dimension, debris, waste, frozen materials, vegetable and other <br /> deleterious matter. Granular fill shall contain no more tha� 1596 passing the No. 200 <br /> sieve such as Mn/DOT 3149 B or C. <br /> ' PART 3 - EXECUTION <br /> ' 3.01 EXCAVATION: <br /> Excavation is Unclassified, and includes excavation to subgrade elevations indicated, <br /> regardless of character of materials and obstructions encountered. <br /> ' Unauthorized excavation consists of removal of ma*Pr�a1c hevond indicated subgrade <br /> elevations or dimensions without specific direction of LA/E. Unauthorized <br /> ' excavation, as well as remedial work directed by LA/E, shall be at <br /> Contractor's expense. <br /> Under footings, foundation bases, or retaining walls, fill unauthoriaed excavation by <br /> ' extending indicated bottom elevation of footing or base to Excavation bottom; without <br /> altering required top elevation. Lean concrete fill may be used to bring elevations to <br /> proper position, when acceptable to.LA/E. <br /> ' Elsewhere, backfill and compact unauthorized excavations as specified for authoriaed <br /> excavations of same classification, unless otherwise directed by LA/E. <br /> ' Additiona! Excavation: When excavation has reached requiced subgrade elevations, <br /> notify Architect Engineer who will make an inspection of conditions. <br /> � If unsuitable bearing materials are encountered at required subgrade elevations, carry <br /> excavations deeper and replace excavated material as directed by Architect/Engineer. <br /> Stability of Excavations: Slope sides of excavations to comply with local codes and <br /> ' � ordinances having jurisdiction. Shore and brace where sloping is not possible because of <br /> space restrictions or stability of material excavated. <br /> ' <br /> ' EARTHWORK 02200 - 3 � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.