Laserfiche WebLink
, <br /> VI. PROJECT SITE , <br /> A. USE OF THE PROJECT SITE <br /> THE CONTRACTOR SHAII NOT UNREASONABLY ENCUMBER THE SITE WITH HIS , <br /> MATERIALS OR EQUIPMENT AND SHALL CONFINE HIS OPERATIONS AS DIRECTED <br /> BY THE CONSULTANT AND THE PARK DISTRICT AND BY THE CONTRACT <br /> DOCUMENTS. THE CONTRACTOR SHALL NOT EXECUTE THE WORK IN SUCH A , <br /> MANNER AS WILL, IN THE OPINION OF THE PARK DISTRICT, HINDER, <br /> INTERFERE WITH, MOLEST OR DELAY THE PROSECUTION OF THE WORK, THE <br /> OPERATION OF THE PARK DISTRICT AT THE SITE, OR THE WORK OF ANY <br /> OTHER CONTRACTOR EMPLOYED BY THE PARK DISTRICT. , <br /> B. DISPOtA OF MATERIALS AND DEBRIS AND CLEAN-UP <br /> 1 . THE CONTRACTOR SHALL, PURSUANT TO PARK DISTRICT PROJECT PLANS, I <br /> SPECIFICATIONS AND CONTRACTS KEEP THE PREMISES fREE FROM <br /> ACCUMULATION OF WASTE MATERIAL OR RUBBISH AND ANY DEMOlITION , <br /> DEBRIS CAUSED BY HIS/HER OPERATIONS. ALL MATERIALS AND DEBRIS <br /> SHALL BE REMOVED FROM PARK DISTRICT PROPERTY AND DISPOSED OF AT <br /> AN OFF-SITE "CONSTRUCTION DEBRIS" LAND FILL OR THROUGH OTHER ' <br /> APPROVED DISPOSAL CHANNELS AS SPECIFIED BY STATE AND FEDERAL <br /> LAW. � <br /> 2. AT THE COMPLETION OF THE WORK AND PRIOR TO RELEASE OF PROJECT ' <br /> FINAL PAYMENT THE CONTRACTOR SHALL REMOVE AlL WASTE MATERIALS, <br /> RUBBISH AND DEBRIS FROM AND ABOVE THE PROJECT, INCLUDING TOOLS, <br /> CONSTRUCTION EQUIPMENT, MACHINERY AND SURPLUS MATERIALS. AT NO , <br /> TIME WILL ANY CONSTRUCTION OR RECONSTRUCTION DEBRIS/MATERIALS <br /> BE BURIED OR IN ANY OTHER MANNER REMAIN WITHIN THE BOUNDARIfS <br /> OF �kNY HENNEPIN PARKS PROPERTY. <br /> 3. IF THE CONTRACTOR FAILS TO CLEAN UP AT THE COMPLETION OF THE , <br /> WORK, THE PARK DISTRICT MAY DO SO AND THE COST THEREOF SHALL BE <br /> CHARGED TO THE CONTRACTOR AND DEDUCTED FROM THE FINAL PAYMENT. � <br /> IN ADDITION, IF AND WHEN THE PARK DISTRICT'S WASTE DISPOSAL <br /> POLICY IS VIOLATED, HENNEPIN PARKS' ORDINANCE AND/OR FEDERAL <br /> AND STATE CRIMINAL LAWS WILL BE ENFORCED. ' <br /> VII. MATERIALS <br /> A. � I <br /> THE CONTRACTOR WARRANTS TO THE PARK DISTRICT THAT MATERIALS AND <br /> EQUIPMENT FURNISHED UNDER THE CONTRACT WILL BE MERCHANTABLE AND , <br /> NEW, THAT THE I�RK WILL BE FREE FROM DEFECTS, AND THAT THE WORK <br /> WILL CONFORM WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. <br /> MATERIALS, EQUIPMENT, AND I�RK NOT CONFORMING TO THIS WARRANTY � <br /> SHALL BE CONSIDERED DEFECTIVE. THIS WARRANTY EXCLUDES DAMAGES <br /> CAUSED BY ABUSE, IMPROPER OR INSUFFICIENT MAINTENANCE, OR NORMAL <br /> WEAR AND TEAR UNDER NORMAL USAGE. <br /> B. CORRECTING DEFECTIVE WORK ' <br /> ALL DEFECTIVE MATERIAL, EQUIPMENT OR WORK, WHETHER OBSERVED BfFORE ' <br /> OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT THEN FABRICATED, <br /> INSTALLED OR COMPLETED, SHALL BE PROMPTLY CORRECTED <br /> GENERAL CONDITIONS ' <br /> PAGE 10 OF 14 <br />