Laserfiche WebLink
' <br /> ' <br /> SPECIFICALLY INfORMED THE CONSULTANT IN WRITING AT THE TIME OF <br /> ' SUBMISSION THAT A SUBMITTAL CONTAINS A DEVIATION FROM THE <br /> REQUIREMENTS OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL <br /> NOT BE RELIEVED OF THE RESPONSIBILITY FOR DEVIATION BY THE <br /> ' CONSULTANT'S APPROVAL OF THE SUBMITTAL. IN ADDITION, THE <br /> CONTRACTOR WILL NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS OR <br /> OMISSIONS IN SUBMITTALS BY THE CONSULTANT'S APPROVAL. IF THE <br /> CONTRACTOR COMMENCES YlORK ON ANY PORTION OF THE WORK REQUIRING <br /> ' SUBMISSION OF A SHOP DRAWING, PRODUCT DATA, SAMPLE OR OTHER <br /> SUBMITTAL PRIOR TO ITS SUBMISSION TO AND APPROVAL BY THE <br /> CONSULTANT, SUCH COMMENCEMENT SHALL BE AT THE CONTRACTOR'S SOLE <br /> ' RISK. <br /> C. RETENTION OF DOCUMENTS. SAMPLES AND SUBMITTALS <br /> , THE CONTRACTOR SHALL MAINTAIN IN GOOD ORDER AT THE PROJECT SITE <br /> RECORD COPIES OF ALL DRAWINGS, SPECIFICATIONS, ADDENDA, CHANGE <br /> ORDERS AND OTHER MODIFICATIONS AND SHALL MARK THEM TO SH�I ALL <br /> , DEVIATIONS FROM THEM MADE DURING CONSTRUCTION. THE CONTRACTOR <br /> SHALL ALSO MAINTAIN SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND ALL <br /> OTHER SUBMITTALS. THE ABOVE ITEMS SHALL BE AVAILABLE TO THE <br /> ' CONSULTANT AT HIS REASONABLE REQUEST, AND TWO SETS OF RED LINED <br /> AS-BUILT BLUEPRINTS WITH 2 COPIES OF ALL PROJECT DOCUMENTS IN A <br /> 3-RING BINDER SHALL BE DELIVERED TO THE PARK DISTRICT AT THE <br /> ' CONCLUSION OF THE WORK. <br /> D. CHANGE ORDERS <br /> ' 1 . WITHOUT INVALIDATING THE CONTRACT, THE PARK DISTRICT MAY ORDER <br /> CHANGES IN THE WORK WITHIN THE GENERAL SCOPE OF THE CONTRACT, • <br /> CONSISTING OF ADDITIONS, DELETIONS OR OTHER REVISIONS, NITH THE <br /> � CONTRACT SUM AND/OR SCHEDULE BEING ADJUSTEO ACOORDINGLY, IF� <br /> NECESSARY. ALL SUCH CHANGES IN THE WORK MhN1ST BE AUTHORIZED BY <br /> A CHANGE ORDER PRIOR TO COMMENCING THE WORK AND MUST BE <br /> , PERFORMED IN ACCORDANCE WITH THE CONTRACT t)OCUMENTS. A CHANGE . <br /> ORDER SIGNED BY THE CONTRACTOR EVIDENCES HIS AGREEMENT NITH A <br /> CHANGE ORDER, INCLUDING, BUT NOT LIMITED T0, ANY ADJUSTMENT IN - <br /> THE CONTRACT SUM AND/OR SCHEDULE INCLUDED IN THE CHANGE ORDER. <br /> ' 2. A CHANGE ORDER MAY RESULT IN AN INCREASE, DECREASE OR NO CHANGE <br /> IN THE RMOUNT OF THE CONTRACT. IF THE PARK DISTRICT AND THE <br /> ' CONTRACTOR CANNOT AGREE ON THE COST OF A CHANGE, THE <br /> CONTRACTOR, UPON RECEIVING A WRITTEN ORDER SIGNED BY THE PARK <br /> DISTRICT, SHALL PROMPTLY PROCEED WITH THE WORK INVOLVED. <br /> � THEREAFTER, THE CONSULTANT SHALL DETERMINE THE COST OF THE <br /> CHANGE ON THE BASIS OF THE REASONABLE EXPENDITURES AND SAVINGS <br /> OF THOSE PERFORMING THE WORK AND ATTRIBUTABLE TO THE CHANGE, <br /> INCLUDING A REASONABLE ALLOWANCE FOR OVERHEAD ANO PROFIT. THE <br /> ' CONSULTANT'S DETERMINATION SHALL BE FINAL. <br /> 1 <br /> GENERAL CONDITIONS <br />, PAGE. 9 OF 14 <br />