Laserfiche WebLink
' <br /> 8. SITE GRADING , <br /> WORK UNDER THIS SECTION SHALL INCLUDE ALL WORK NECESSARY TO PROPERLY ' <br /> CONSTRUCT THE PARKING LOT, DRIVEWAY AND HOLDING POND AS SHOWN ON THE <br /> DRAWINGS AND IN ACCORDANCE WITH SECTION 2105 OF TNE 1988 MNDOT <br /> SPECIFICATIONS AS MODIFIED BELOW. <br /> A. TOPSOIL ' I <br /> ALL TOPSOIL SHALL BE REMOVED FROM THE PARKING LOT, DRIVEWAY AND ' <br /> HOLDING POND AREAS WHILE PRESERVING ANY EXISTING VEGETATION AS NOTED <br /> ON THE PLAN. ADEQUATE TOPSOIL SHALL BE STOCKPILED TO PROVIDE 6" <br /> TOPSOIL FOR PLACEMENT ON ALL DISTURBED AREAS. ' <br /> B. EXCAVATION AND PLACEMENT/COMPACTION SHALL BE DONE AS NECESSARY TO <br /> CONSTRUCT THE PARKING LOT, DRIVEWAY AND HOLDING POND AS SHOWN ON THE ' <br /> DRAWINGS, LN GENERAL, THE AREA TO BE EXCAVATED FOR THE PARKING LOT <br /> EXISTS ON RELATIVELY FLAT GROUND (SLOPES FROM 2 - 3.5X) . THE OUTER <br /> EDGES OF THE AREA DRAIN ONTO THE SITE AND FOLLOWS A BROAD WESTERLY <br /> OVERFLOW OVER AN EXISTING DRIVEWAY. DUE TO THE PERIODIC�tLLY WET ' <br /> NATURE OF THE SITE, SOME EXCAVATION OF NON-COMPACTIBLE SOILS MAY BE <br /> NECESSARY. REFER TO THE ENCLOSED SOILS REPORT SECTION C.5 FOR <br /> RECOMMENDED SUBGRADE PR�PARATION. ' <br /> THE NEW AGGREGAT� DRIVEWAY SHALL BE GRADED INTO AN EXISTING SLOPE <br /> RANGING FROM 10-20X THAT DRAINS INTO THE NORTH DITCH OF C0. RD. 51 . <br /> CUTS SHOULD AVERAGE AROUND 3.5 - 4 FEET DEEP FOR THE DRIVEWAY AREA. ' <br /> FIELD EVALUATION BY THE ENGINEER SHALL DETERMINE WHETHER OR NOT ANY <br /> EXCAVATED MATERIAL CAN BE USED AS FILL FOR THE PARKING LOT GRADING. <br /> THE HOtDING POND SITE IS LOCATED WITHIN A LOW AND PERIODICALLY ' <br /> FLOODED WETLAND AREA. THE BOTTOM OF PROPOSED HOLDING POND IS TO BE <br /> EXCAVATED 6 FEET BELOW EXISTING GRADES. SOILS IN THIS AREA CAN BE t <br /> EXPECTED TO BE HYDRIC IN NATURE. THE SITE CONNECTS TO A LARGER MARSH <br /> AREA LOCATED TO THE NORTH VIA A CULVERT UNDER C0. RD. 51 . <br /> C. PUMPING OR BAILING ' <br /> IF, DURING THE CONSTRUCTION, WATER SHALL BE FOUND OR WATER FILLS <br /> TRENCHES OR BOTT�1 OF EXCAVATIONS BY REASON OF GROUNDWATER, RAIN OR ' <br /> ANY OTHER CAUSE, THE SAME SHALL BE PUMPED OR BAILED BY THE CONTRACTOR <br /> AND EXCAVATIONS KEPT FREE FROM WATER WITHOUT EXPENSE TO THE OWNER <br /> UNTIL COMPLETION OF THE WORK. <br /> D. SURPLUS MATERIALS ' <br /> ANY SURPLUS EXCAVATED MATERIAL SHALL BE DISPOSED OF BY THE CONTRACTOR , <br /> AT HIS EXPENSE AT AN APPROPRIATE DISPOSAL AREA OFF SITE. <br /> E. FINISH GRADING ' <br /> SITE GRADING SHALL BE FINISHED IN A WORKMANLIKE MANNER, TRUE TO GRADE <br /> WITHIN 0.1 FOOT OF FINISH GRADE AS SHOWN ON THE DRAWINGS. A BLADE ' <br /> GRADER AND A HEAVY (STEEL H) BEAM DRAG SHALL BE USED, AS REQUIRED, <br /> DURING FINISH GRADING OPERATIONS. <br /> SECTION D I <br /> PAGE 2 OF 4 <br />