Laserfiche WebLink
' <br /> ' SECTION D — SPECIAL PROVISIONS TO THE TECHNICAL SPECIFICATIONS <br /> WHERE ANY ARTICLE OF THE TECHNICAL SPECIFICATIONS IS SUPPLEMENTED BY � <br /> ' PROVISIONS, HEREIN SET FORTH, ALL SUCH PROVISIONS SHALL TAKE PRECEDENCE OVER <br /> THOSE OF THE TECHNICAL SPECIFICATIONS. ALL PROVISIONS OF THE TECHNICAL <br /> SPECIFICATIONS, NOT SPECIFICALLY SUPPLEMENTED, AMENDED OR SUPERCEDED SHALL <br /> REMAIN IN FORCE. <br /> ' 1 . CLEAN—UP <br /> ' BEFORE FINAL ACCEPTANCE, THE CONTRACTOR SHALL CLEAN UP THE AREA TO THE <br /> SATISFACTION OF THE ENGINEER. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO <br /> THE PROJECT AS A WHOLE. <br /> , 2. PRESERVATION OF THE AREA ' <br /> THE CONTRACTOR SHALL TAKE ALL RESPONSIBLE PRECAUTIONS TO PRESERVE THE <br /> ' NATURE OF THE AREA. WORK TASKS SHALL BE SO MANAGED .TO PROVIDE THE LEAST <br /> DISRUPTION TO THE EXISTING VEGETATION, TREES, ROADS, ETC. THE AREA SHALL <br /> BE RESTORED TO CONDITIONS AS GOOD OR BETTER THAN EXISTING CONDITIONS. <br /> I3. EROSION PROTECTION <br /> ' CONTRACTOR SHALL PLACE A SILT FENCE IN THE AREAS INDICATED ON THE PLAN. <br /> PAYMENT FOR THE SILT FENCE SHALL BE BY THE LINEAR FOOT. <br /> ' 4 �Sa <br /> THE OWNER WILL PERFORM COMPACTION TESTS ON THE SUBGRADE AND THE CLASS 5 <br /> BASE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF ANY FAILING <br /> ' TESTS. <br /> 5. PERMITS <br /> , IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN TH� NECESSARY WORK <br /> PERMITS OR BUILDING PERMITS AND TO PROVIDE ALL NECESSARY BON�S OR DEPOSITS <br /> THEREFORE. <br /> , 6. UNDERGROUND UTILITIES <br /> ' THERE MAY BE WITHIN THE PROJECT, BURIED ELECTRIC CABLES, TELEPHONE OR <br /> TELEVISION CABLES. IT SHALL BE THE COMTRACTOR'S RESPONSIBILITY TO CONTACT <br /> THE APPROPRIATE UTILITY COMPANIES AND TO LOCATE ALL IiTILITIES. ANY DAMAGE <br /> ' TO UTILITIES ARISING FROM THE CONTRACTOR'S WORK SHALL BE HIS <br /> RESPONSIBILITY. <br /> 7. LAYING OUT THE WORK: <br /> IA. THE OWNER WILL PROVIDE FIELD CREWS AS NECESSARY TO ESTABLISH CONTROL <br /> LINES AND INDICATE PLAN LINE AND GRADE. THE CONTRACTOR MUST TAKE <br /> ' EVERY REASONABLE PRECAUTION NECESSARY TO PRESERVE AND MAINTAIN STAKES <br /> AND REFERENCE POINTS THROUGHOUT EACH PHASE OF THE WORK. FAILURE TO <br /> DO SO WILL RESULT IN DEDUCTIONS FROM CONTRACT PAYMENTS IN THE AMOUNT <br /> ' OF THE DIRECT AND INDIRECT COSTS OF REPLACEMENTS. <br /> � SECTION D <br /> PAGE 1 OF 4 <br />