My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parking lot project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Parking lot project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:29 PM
Creation date
10/16/2017 3:08:08 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ' <br /> B. THE CONTRACTOR SHALL NOT ALLOW RUBBISH OR WASTE MATERIAL TO <br /> , <br /> ACCUMULATE ON OR ABOUT THE PREMISES. AT THE COMPLETION OF THE WORK HE SHALL <br /> PROMPTLY REMOVE ALL RUBBISH AND WASTE MATERIAL AND LEAVE THE BUILDING BROOM , <br /> CIEAN AND READY FOR USE. HE SHALL LEAVE ADJOINING PROPERTY CLEANED OF REFUSE <br /> AND REPAIR TO THE SATISFACTION OF THE ARCHITECT. THE CONTRACTOR SHALL PROTECT <br /> EXISTING FEATURES AND ELEMENTS WHICH ARE TO REMAIN. HE SHALL RESTORE OR , <br /> REPLACE, A�T HIS OWN EXPEN$E, ALL DAMAGE TO SAME. <br /> 6. EXISTING UTILITY LINE AND SERVICES � <br /> A. IF ACTIVE UTILITY LINES OR SERVICES ARE ENCOk1NTERED IN THE WORK, THEY ' <br /> SHALL BE PROPERLY PROTECTED, BRACED AND SUPPORTED� AS REQUIRED FOR THE PROPER <br /> PROGRESS AND EXECUTION OF THE WORK. IF EXISTING ACTIVE UTILITY LINES OR ' <br /> SERVICES ARE ENCOUNTERED THAT REQUIRE RELOCATION TO PROPERLY PERFORM THE WORK, <br /> NOTIFY THE ARCHITECT FOR A DETERMINATION. CONTRACTOR SHALL NOT PROCEED WITH <br /> THE I�RK UNTIL WRITTEN DIRECTIONS ARE RECEIVED�. CONTRACTOR SHALL NOT PREVENT ' <br /> OR DISTURB THE OPERATION OF ACTIVE UTILITY LINES AND SERVICES THAT ARE TO <br /> REMAIN. <br /> 7. PROGRESS OF WORK , <br /> A. A SUFFICIENT NUMBER OF GOMPETENT PERSONNEL SHALL BE CONTINUALLY <br /> EMPLOYED BY THE CONTRACTOR AND SUBCONTRACTORS TO SATISFY THE OWNER AND THE , <br /> ARCHITECT THAT THE WORK WILL BE COMPLETED BY THE TIME SPECIFIED, OR IN SUCH <br /> TIME AS NOT TO DELAY THE WORK OF OTHERS. <br /> 8. OUALITY OF MATERIALS AND WORK ' <br /> A. ALL WORK DESCRIBED IN THESE SPECIFICATIONS OR SHOWN ON THE DRAWINGS, <br /> AND ALL WORK NECESSARY TO THE COMPLETE FINISH OF THE WORK AS DESCRIBED OR ' <br /> SHOWN IS TO BE EXECUTED IN A THOROUGHLY SUBSTANTIAL AND WORKMANLIKE MANNER. <br /> B. ALL WORK, FIXTURES, MATERIALS, EQUIPMENT AND APPARATUS SHALL BE NEW ' <br /> AND SHALL BE FIRST CLASS IN EVERY RESPECT, AND ALL SHALL BE DELIVERED UPON THE <br /> COMPLETION OF THE WORK IN A PERFECT AND UNDAMAGED CONDITION WITHOUT EXCEPTION. <br /> C. ALL WORK SHALL BE DONE BY PERSONNEL WHO ARE THOROUGHLY EXPERIENCED IN , <br /> THEIR PARTICULAR TRADE OR CRAFT. <br /> 9. USE AND OCCUPANCY ' <br /> A. USE AND OCCUPANCY OF THE PROJECT BY THE OWNER PRIOR TO FORMAL <br /> ACCEPTANCE OF THE WORK, IF AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, DOES , <br /> NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO MAINTAIN INSURANCE AS <br /> HEREINBEFORE SPECIFIED ON A 100X BASIS FOR THE BENEFIT OF THE OWNER, AND ALL <br /> OTHERS HEREINBEFORE SPECIFIED UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY <br /> THE OWNER, AND CONTRACTOR HAS RECEIVED THE FINAL PAYMENT. ' <br /> 10. COMPLETION DATE <br /> A. SEE INSTRUCTIONS TO BIDDERS, 8. COMMENCEMENT AND COMPLETION OF �HE . , <br /> WORK. <br /> ' <br /> SPECIAL CONDITIONS , <br /> PAGE 2 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.