My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parking lot project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Parking lot project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:29 PM
Creation date
10/16/2017 3:08:08 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> ' � SECTION B. SPECIAL CONDITIONS . <br /> ' 1 . EG NERAL ' <br /> A. THE FOLLOWING SPECIAL CONDITIONS SUPPLEMENT THE GENERAL CONDITIONS. <br /> ' B. THE OWNER'S REPRESENTATIVE ON THIS JOB IS THE DEPARTMENT OF PLANNING <br /> & ENGINEERING, SUBURBAN HENNEPIN REGIONAL PARK DISTRICT, 12615 COUNTY ROAD 9, <br /> PLYMOUTH, MN 55441-1248. <br /> ICOOPERATION WITH BUILDING OFFICIALS <br /> ' A. COOPERATE WITH APPLICABLE GOVERNMENTAL OFFICIALS AND INSPECTORS AT <br /> ALL TIMES. IF SUCH OFFICIAL OR INSPECTOR DEEMS SPECIAL INSPECTION NECESSARY, <br /> PROVIDE ASSISTANCE AND FACILITIES THAT WILL EXPEDITE HIS INSPECTION. <br /> , 3. PROGRESS MEETINGS <br /> A. FROM TIME TO TIME AND AS DEEMED NECESSARY BY THE OWNER, PROGRESS <br /> ' MEETINGS MAY BE SCHEDULED AT THE PROJECT SITE TO ASSURE THE PROPER PROGRESS <br /> AND EXECUTION OF THE WORK. THESE MEETINGS SHALL BE ATTENDED BY QUALIFIED <br /> PERSONNEL REPRESENTING THE OWNER, AND THE CONTRACTOR. <br /> ' 4. TEMPORARY F�ACILITIES <br /> A. STORAGE FACILITIES <br /> ' (1 ) THE CONTRACTOR SHALL PROVIDE, OR ARRANGE FOR, WEATHER-TIGHT <br /> STORAGE FOR CEMENT, PAINT, FINISH MATERIALS, AND OTHER MATERIALS REQUIRING <br /> � PROTECTION FROM THE WEATHER. � <br /> B. SANITARY FACILITIES <br /> , (1 > THE CONTRACTOR, AT HIS EXPENSE, SHALL PROVIDE AND MAINTAIN <br /> TEMPORARY SANITARY FACILITIES DURING THE CONSTRUCTION. <br /> ' C. TEMPORARY WATER <br /> (1 ) THE CONTRACTOR SHALL PROVIDE, OR ARRANGE FOR, ALL POTABLE WATER <br /> , AND ANY WATER REQUIRED FOR CONSTRUCTION PROCEDURES. <br /> D. TEMPORARY LIGHT AND POWER <br /> ' (1 > THE CONTRACTOR, AT HIS EXPEN.SE, SHALL PROVIDE ALL TEMPORARY <br /> POWER FOR CONSTRUCTION PURPOSES. <br /> ' 5. GARE OF THE PREMISES <br /> A. FROM THE TIME THE WORK IS BEGUN UNTIL THE CONTRACT WORK IS COMPLETED, : <br /> ' THE CONTRACTOR SHALL HAVE THE CARE OF THE PREMISES, SUBJECT TO THE RIGHTS OF <br /> THE OWNER AND OTHER SUBCONTRACTORS ENGAGED THEREON. <br /> , SPECIAL CONDITIONS <br /> PAGE 1 OF 3 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.