My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 3.3.8 Pum�Installation <br /> The Contracta shall install the pump in the well at the elevation directed by the Engineer in , <br /> accordat►ce with recommendadons of the pump manufacturer. Prior to placement,the Contracta <br /> shall assure p�+opa motor connection, impella adjustrnent, lubrication, and all other checks � <br /> mquirred for pump and mota. <br /> Pump installation includes fumishing and installing the PumP�a11 droP Pipe from the pump to the � <br /> surface plat�e.the surface plate,electrical conduit and junction box,power cable from the pump <br /> to S-feet above the snrface plate,and the discharge piping and related valves. The powe,r cable <br /> sl�sll be attached to the drop pipe by an approved method at a minimum of 10-foot intervals. � <br /> Adjusting the well casing height and welding a tlange at the top to match the sarface plate will <br /> also be included in pump installadon. � <br /> The drnp pipe shaU be assembled ro provide dght,leak hce joints. Tt�e submerged check valve, � <br /> if not an integcal part of the pump,shall be installed on discharge side of pump. <br /> 3.3.9 Starw � <br /> Following connecdon of the d.ischarge pipe and installation of electrical controls,the Cont�acta� <br /> shall allow for time W be present during pump startup. The Contractor shall prnvide to the � <br /> Owner all c�perating manuals and specificadons for the motor and pump,as specified previously <br /> in these Specifications. <br /> 3.3.10 Disinfectian and Samolina � <br /> Aft�all work on the well has been completed the Contractor shail disinfect and sample the well � <br /> in accordance with the requirements of the Minnesota Department of Health Water Well <br /> Construcaon Code, S 4725.6500 and 4725.6600. <br /> 3.3.11 Concrete Slab and Boa Cova ' <br /> The concrete slab shall be placod and po�ed araund the well casing as specified by the Engineer. � <br /> Installadon of the slab shall be coordinated with the installation of the discharge line to the wat� <br /> wwer. The discharge line will go through the slab (set other apprapriate secdons of these � <br /> Specifications). 1/Z-inch biduninous felt shall be placed around the well casing and discharge <br /> line W pamit movement during freezing and thawing. Temperature and shrinkage steel shall be <br /> placed at 12-inches on-center in the middle of the slab. � <br /> The 1/4-inch steel platsd box shall be anchored w the slab with Kwik bolts as specified. <br /> 3.4 METHOD OF MEASUREMENT AND PAYMENT I <br /> Payment for all the materials,equipment,and labor necessary tn construct the well and otherwise satisfy � <br /> the contract shall be made thcough the various bid items included in the proposal. Payment will be made <br /> TS-3-8 ' <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.