h the tem ca to the ' <br /> and testing fa plumbr�ss and alignment, the Contractar shall attac porary p <br /> casing by two spot welds located 180-degrees from each other,unless directed otherwise by the , <br /> Owne�s Representative. The cost of temporary capping will be considered incidental to the <br /> work. <br /> 3.3.4 Testina for Pltunbness and Alianment ` <br /> Upon completion of the well construction,the Contractar shall demonstrate to the Ovmer that the � <br /> well is straight and vertical. The test shall be made in accordance with the methods established <br /> in current odition AWWA A100, Section 8. and Appendix C of the American Water Works <br /> Association Standard for Water Wells and witnessed by the Ovme,�s Representadve. � <br /> Should the well fail d�e plumbness or alignment requirements stated above,the Contractor shall <br /> comect such fault�or drill a new well and abandon the unsuccessful well at the Conuacto�s own � <br /> ezpense. No payment will be made fa well conswcdon, well develo�m►ent and grouting for <br /> wells not meeting the alignment and plumbness requirements. <br /> r hall be 'd for one lumbness and ali ent test made upon completion of the � <br /> The Conuacto s pai P 8� <br /> well. The Conhractor may make alignment tests at the Contractor's own expense at any time � <br /> d�ring construcaai of the well. The Owner reserves the right to require the Conuactor to make <br /> alignment tests at any time during construction of the well. If the well passes the alignment test <br /> the Owna will be responsible for the cost of the test. If the well fails an alignment test, the � <br /> Contractor shall bear all costs of all further alignment tests W vaify the adeqoacy of correcave <br /> work or the alignment tests of a new well drilled by the Contractor. <br /> 3.3.5 Well Develo�ment , <br /> The well shall be developefl to remove fines, stabilize the aquifer around the borehole, and � <br /> maximize tlu specific capacity of the well. Development shall be horizontal jetting and <br /> simnl�neous air-lift pumping(reference.F.G.Drisc;oll,Groundwater and Wells. 1986,pg.520). <br /> The outside diameux tt�e jeaing tool shall be 1.0 inch in diameter less than the inside diameter � <br /> of the scrxn. 'Ihe minimum exit velocity of the jet�ing fluid at the nozzle will be d�pendent on <br /> the drilling condidons encountered will be set by the Enginea; the Contractoc shall have <br /> equipment with d�e capability of 150 feet per second 'Il►e jetting procedure shall proce�d from , <br /> the bouom of the screen t�the tap. The jeuing tool shall be placed at one horizontal position, <br /> rotated at approximately one round per minute for at least one minute�and then raised to the nezt <br /> horizontal posioi�on which shall be no more than 6 inches above the preceding jeuing position. � <br /> During jetdng the well shall be pumped at a rat�e from 10 to 20 percent more than the volume <br /> of water introduced through the jetting t�ooL 'It�e boaom of the air line shall maintained just , <br /> above die jeuing t�ool. <br /> Development shall proceed until the well yields a sustained discharge of 40 gpm with a sand � <br /> content of 1 part per million or less. When the Conuactnr feels the discharge is acceptable,the <br /> Contractor shall notify the Engineer and shall perform a sand content test in the presence of the <br /> Engineer or Enginee�'s Representadve. The Contractor shall notify the Engineer at least 24 hours , <br /> in advance of when the sand content test will be perforn►ed. <br /> TS-3� � <br /> ' <br />