Laserfiche WebLink
' <br /> VI. PROJECT SITE <br /> A. t�SF OF THE PROJECT SITE I <br /> THE CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER THE SITE WITH HIS ' <br /> MATERIALS OR EQUIPMENT AND SHAIL CONFINE HIS OPERATIONS AS DIRECTED <br /> BY. THE CONSULTANT AND THE PARK DISTRICT AND BY THE CONTRACT <br /> DOCUMENTS. THE CONTRACTOR SHALL NOT EXECUTE THE WORK IN SUCH A <br /> MANNER AS WILL, IN THE OPINION OF THE PARK DISTRICT, HINDER, ' <br /> INTERFERE WITH, MOLEST OR DELAY THE PROSECUTION OF THE WORK, THE <br /> OPERATION OF THE PARK DISTRICT AT TNE SITE, OR THE WORK OF ANY <br /> OTHER CONTRACTOR EMPLOYED BY THE PARK DISTRICT. , <br /> g, nTcpncai OF MATERIALS AND DEBRIS AND CLEAN-UP <br /> 1 . THE CONTRACTOR SHALL, PURSUANT TO PARK DISTRICT PROJECT PLANS, ` <br /> SPECIFICATIONS AND CONTRACTS KEEP THE PREMISES FREE FROM <br /> ACCUMULATION OF WASTE MATERIAL OR RUBBISH AND ANY DEMOLITION <br /> DEBRIS CAUSED BY HIS/HER OPERATIONS. ALL MATERIALS AND DEBRIS ' <br /> SHALL BE REtAOVED FROM PARK DISTRICT PROPERTY AND DISPOSED OF AT <br /> AN OFF-SITE "CONSTRUCTION DEBRIS" LAND FILL OR THROUGH OTHER <br /> APPROVED DISPOSAL CHANNELS AS SPECIFIED BY STATE AND FEDERAL , <br /> LAW. <br /> 2. AT THE COMPLETION OF THE WORK AND PRIOR TO RELEASE OF PROJECT , <br /> FINAL PAYMENT THE CONTRACTOR SHALL REMOVE ALL WASTE MATERIALS, <br /> RUBBISH AND DEBRIS FROM AND ABOVE THE PROJECT, INCLUDING TOOLS, <br /> CONSTRUCTION EQUIPMENT, MACHINERY AND SURPLUS MATERIALS. AT NO <br /> TIME WILL ANY CONSTRUCTION OR RECONSTRUCTION DEBRIS/MATERIALS ' <br /> BE BURIED OR IN ANY OTHER MANNER REMAIN WITHIN THE BOUNDARIES <br /> OF ANY HENNEPIN PARKS PROPERTY. <br /> 3. IF THE CONTRACTOR FAILS TO CLEAN UP AT THE COMPLETION OF THE , <br /> WORK, THE PARK DISTRICT MAY DO SO AND THE COST THEREOF SHALL BE <br /> CHARGED TO THE CONTRACTOR AND DEDUCTED FROM THE FINAL PAYMENT. <br /> IN ADDITION, IF AND WHEN THE PARK DISTRICT'S WASTE DISPOSAL , <br /> POLICY IS VIOLATED, HENNEPIN PARKS' ORDINANCE AND/OR FEDERAL <br /> AND STATE CRIMINAL LAWS WILL BE ENFORCED. <br /> VII. MATERIALS � <br /> A. WARRANL�C , <br /> THE CONTRACTOR WARRANTS TO THE PARK DISTRICT THAT MATERIALS AND <br /> EQUIPMENT FURNISHED UNDER THE CONTRACT WILL BE MERCNANTABLE AND <br /> NEW, THAT THE WORK WILL BE FREE FROM DEFECTS, AND THAT THE WORK ' <br /> WILL CONFORM WITH THE REQUIREMENTS OF .THE CONTRACT DOCUMENTS. <br /> MATERIALS, EQUIPMENT, AND WORK NOT CONFORMING TO THIS WARRANTY <br /> SHALL BE CONSIDERED DEFECTIVE. THIS WARRANTY EXCLUDES DAMAGES ' <br /> CAUSED BY ABUSE, IMPROPER OR INSUFFICIENT MAINTENANCE, OR NORMAL <br /> WEAR AND TEAR UNDER NORMAL USAGE. <br /> B. CORRECTING DEFECTIVE WORK , <br /> ALL DEFECTIVE MATERIAL, EQUIPMENT OR WORK, WHETHER OBSERVED BEFORE <br /> OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT THEN FABRICATED, , <br /> INSTALLED OR COMPLETED, SHALL BE PROMPTLY CORRECTED <br /> GENERAL CONDITIONS , <br /> aor.F �n nF �d <br />