Laserfiche WebLink
. , • � <br /> 6. FITTINGS Fittings for pool will be placed where required and anchored to assure <br /> position during concrete placement. <br /> 7. COPING 112! prnirar� ��crQte C.CLr*�lri�'* <br /> 8. TILE A ti " water line tile will be placed the full perimeter of the pool. <br /> Wa c�r 1 i n _ i 1 _ hy T1 1 i t�Gi nna �" x�" ratai 1 � nar a ft <br /> tile accent at steps & swim outs <br /> 9. INTERIOR FINISH Surface will be finished with an appropriate plaster for this <br /> type of work approximately '/a to '/z" thick. The finish will be applied by workmen <br /> experienced in this field. Finish will be wh; +-P mar�,jl P �a�t.n,- <br /> 10. CONCRETE DECK Deckwork will be as stated in the attached proposal. <br /> Concrete deck finish sq. ft. " Thick nominal <br /> NA <br /> Concrete will be air-entrained, 3,500 P.S.I. <br /> 11 . POOL MECHANICAL EQUIPMENT Mechanical equipment, heater, filters, <br /> chlorinators, misc. fittings and valyes, (specific list of major components per <br /> equipment list supplied with proposal) will be furnished in place. <br /> Material for recirculating, drain and return lines will be polyvinyl chloride schedule <br /> 40 type II. � <br /> 12. POOL EQUIPMENT Pool equipmentwill be as listed under "Pool Equipment List" <br /> attached to the proposal. <br /> Page 2 of 2 <br />