My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05590 - pool
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2685 North Shore Drive - 09-117-23-42-0004
>
Permits/Inspections
>
2002-P05590 - pool
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:26 PM
Creation date
10/16/2017 1:38:38 PM
Metadata
Fields
Template:
x Address Old
House Number
2685
Street Name
North Shore
Street Type
Drive
Address
2685 North Shore Dr
Document Type
Permits/Inspections
PIN
0911723420004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. . <br /> , :::•. <br /> � ������� esi ner Pools <br /> g <br /> � ,, BY VOSSEN INC. <br /> ''.'.. '�•. :.�'.. •:''.'� � POOLS & SPAS <br /> <. <br /> Concrete Construction • Residential • Commercial <br /> 16950 Welcome Avenue S.E. • P.O. Box 504 • Prior Lake, Minnesota 55372 • 447-6084 <br /> SPECIFICATION for walker Residence <br /> 1 . SCOPE OF WORK The work will include all labor, material, and equipment to <br /> complete pool in accordance with the attached proposal dated �26—c1.2 . <br /> 2. DIMENSION AND DESIGN Pools and deckwork will be per "Designer Pools by <br /> Vossen Inc." standard design as noted in the attached proposal. Site soil bearing <br /> conditions assumed adequate for pool. <br /> 3. EXCAVATION Excavation will be accomplished as required using proper <br /> , equipment and experienced personel. <br /> This proposal is based upon normal excavation conditions. Normal excavation is <br /> defined as any excavation that can be removed from its natural bed by a back hoe or <br /> equal, operated in a normal manner. If during the excavation operation, hardpan, <br /> rock or other material which requies drilling and/or blasting, or special excavation <br /> equipment or earth caving or water seepage is uncovered and/or any unusual <br /> situation is found to exist where additional excavation time is required, Contractor <br /> has the right to charge Owners all cost of excavation. <br /> 4. PNUEMATIC CONCRETE SHELL Pool shell will be placed, insofar as possible in <br /> one monolithic casting of concrete. Construction joints, if required will be made with <br /> reinforcing steel passing through joint and joint will be brushed and slushed with <br /> concrete prior to construction on pool shell placement. <br /> Concrete will be placed with the proper equipment designed for this type of work and <br /> will be operated and supervised by personel experienced in the use of such <br /> equipment <br /> Concrete will be 4000 P.S.I. strength at 28 day test, (8) bag buckshot pumping mix. <br /> Walls: g , " Thick Floors: 6 " Thick <br /> 5. REINFORCING STEEL Reinforcing steel will be standard sizes and will be new <br /> and free of rust, dirt, oil, or paint. Placement will be as follows: <br /> Walls: # 4 , � 2 " O.C. Vertical � <br /> # 4 _ , � 2 " O.C. Horizontal <br /> Floor: # 4 , � 2 " O.C. Each Way <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.