Laserfiche WebLink
SPECIAL CONSTRUCTION <br /> permitted to be used as the roof or as a skylight on build- shall be capable of maintaining membrane structures used <br /> ings of Type IIB,III,IV and V construction,provided it is as a roof for Type I construction not less than 20 feet(6096 <br /> at least 20 feet(6096 mm) above any floor, balcony or mm)above floor or seating areas.The support system shall <br /> gallery. be capable of maintaining other membranes at least 7 feet <br /> (2134 mm) above the floor, seating area or surface of the <br /> 3102.7 Engineering design. The structure shall be designed �,ater. <br /> and constructed to sustain dead loads; loads due to tension or <br /> inflation;live loads including wind,snow or flood and seismic <br /> loads and in accordance with Chapter 16. SECTION 3103 <br /> 3102.8 Inflation systems. Air-supported and air-inflated TEMPORARY STRUCTURES <br /> structures shall be provided with primary and auxiliary infla- 3103.1 General.The provisions of this section shall apply to <br /> tion systems to meet the minimum requirements of Sections structures erected for a period of less than 180 days.Tents and <br /> 3102.8.1 through 3102.8.3. other membrane structures erected for a period of less than 180 <br /> 3102.81 Equipment requirements.This inflation system days shall comply with the International Fire Code. Those <br /> shall consist of one or more blowers and shall include provi- erected for a longer period of time shall comply with applicable <br /> sions for automatic control to maintain the required infla- sections of this code. <br /> tion pressures.The system shall be so designed as to prevent 3103.11 Permit required.Temporary structures that cover <br /> overpressurization of the system. an area in excess of 120 square feet (11.16 mz),including <br /> 3102.8.1.1 Auxiliary inflation system. In addition to connecting areas or spaces with a common means of egress <br /> the primary inflation system, in buildings exceeding or entrance which are used or intended to be used for the <br /> 1,500 square feet(140 m'-)in area,an auxiliary inflation gathering together of 10 or more persons, shall not be <br /> system shall be provided with sufficient capacity to erected, operated or maintained for any purpose without <br /> maintain the inflation of the structure in case of primary obtaining a pernut from the building official. <br /> system failure.The auxiliary inflation system shall oper- <br /> ate automaticaily when there is a loss of internal pressure 3103.2 Construction documents. A permit application and <br /> and when the primary blower system becomes inopera- construction documents shall be submitted for each installation <br /> tive. of a temporary structure. The construction documents shall <br /> include a site plan indicating the locarion of the temporary <br /> 3102.8.1.2 Blower equipment.Blower equipment shall structure and information delineating the means of egress and <br /> meet the following requirements: the occupant load. <br /> 1. Blowers shall be powered by continuous-rated 3103.3 Location. Temporary structures shall be located in <br /> motors at the maximum power required for any accordance with the requirements of Table 602 based on the <br /> flow condition as required by the structural design. fire-resistance rating of the exterior walls for the proposed type <br /> 2. Blowers shall be provided with inlet screens,belt of construction. <br /> guards and other protective devices as required by 3103.4 Means of egress.Temporary structures shall conform <br /> the building official to provide protection from to the means of egress requirements of Chapter 10 and shall <br /> injury. have a maximum exit access travel distance of 100 feet(30 480 <br /> 3. Blowers shail be housed within a weather-protect- mm). <br /> ing structure. <br /> 4. Blowers shall be equipped with backdraft check <br /> dampers to minimize air loss when inoperative. SECTION 3104 <br /> 5. Blower inlets shall be located to provide protection <br /> PEDESTRIAN WALKWAYS AND TUNNELS <br /> from air contamination.The location of inlets shall 31041 General. This section shall apply to connections <br /> be approved. between buildings such as pedestrian walkways or tunnels, <br /> 3102.8.2 Standby power.Wherever an auxiliary inflation �ocated at,above or below grade level,that are used as a means <br /> system is required, an approved standby power-generating of travel by persons.The pedestrian walkway shall not contrib- <br /> system shall be provided.The system shall be equipped with ute to the building area or the number of stories or height of <br /> a suitable means for automatically starting the generator set <br /> connected buildings. <br /> upon failure of the normal electrical service and for auto- 3104.2 Separate structures. Connected buildings shall be <br /> matic transfer and operation of all of the required electrical considered to be separate structures. <br /> functions at full power within 60 seconds of such service Exceptions: <br /> failure. Standby power shall be capable of operating inde- <br /> pendently for a minimum of 4 hours. 1. Buildings on the same lot in accordance with Section <br /> 3102.8.3 Support provisions. A system capable of sup- <br /> 503.1.2. <br /> porting the membrane in the event of deflation shall be pro- 2. For purposes of calculating the number of Type B <br /> vided for in air-supported and air-inflated structures having units required by Chapter 11, sti�ucturally connected <br /> an occupant load of 50 or more or where covering a swim- buildings and buildings with multiple wings shal]be <br /> ming pool regardless of occupant load.The support system considered one structure. <br /> 530 2006 INTERNATIONAL BUILDING CODE� <br />