Laserfiche WebLink
Mr. Gary Gleason, P.E. 17 January 17, 2001 <br /> GME Project No. 9256 <br /> excavation safety is the sole responsibility of the contractor. <br /> Reference to this OSHA requirement should be included in the job <br /> specifications . <br /> The responsibility to provide safe working conditions on the site, for <br /> earthwork, building construction, or any associated operations, is not <br /> borne in any manner by GME Consultants, Inc. <br /> Construction Testing <br /> � We recommend that the Owner, or the designers acting as the Owner' s <br /> � representative, retain the testing services for this project, in <br /> accordance with the Uniform Building Code. This should include � <br /> observation and testing of subgrade soils during site preparation, and <br /> laboratory Proctor tests, and gradation tests and field density tests of <br /> compacted fill and backfill. The building materials should be <br /> constructed in accordance with UBC requirements or "Special Inspections." <br /> We welcome the opportunity to provide the observation and testing <br /> services for this project . � <br /> QENERAL QUALIFICATIONS <br /> This report has been prepared based on the soil and groundwater <br /> conditions found in our borings and on the design data available from <br /> OM�CONSULTANTt,INC. <br />