' 443 Lafayette Road N. MINNE�GTA DEPARTMEhIT �F' (651)284-5005
<br /> St. Paul, Minnesota 55155 � � ]� p/� � Ic 1-800-DIAL-DLI
<br /> www.dli.mn.gov l..,C1DV� � ���V r���Y TTY: (651)297-4198
<br /> �
<br /> Division of Construction Codes and Licensing
<br /> REPORT ON PLANS
<br /> Plans and specifications on plumbing: Creative Kids Academy,2180 North Shore Dr., Orono,Hennepin County,
<br /> Minnesota, Plan No. PLB1203-00024
<br /> OWNERSHIP: Rajir Garg, 855 Village Center Dr, St. Paul,MN 55127
<br /> SUBMITTER(S): City View Plumbing and Heating Company I, 1880 B W Wayzata Blvd, Long Lake, MN
<br /> 55356
<br /> Date Received: Apri15,2012, March 2, 2012
<br /> Date Reviewed: April 6,2012
<br /> SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the
<br /> Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which
<br /> this plumbing system is connected. The review is based upon the supposition that the data on which the design is
<br /> based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility
<br /> for the design of structural features and the efficiency of equipment must be taken by the project designer.
<br /> Approval is contingent upon satisfactory disposition of any requirements included in this report. Special care
<br /> should be talcen to insure that the material and installation of the plumbing system are in accordance with the
<br /> provisions of the Minnesota Plumbing Code. A copy of the approved plans,specifications,and this Report on
<br /> Plans must be retained at the project location for future reference.
<br /> INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of
<br /> the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830, no plumbing work may be
<br /> covered prior to completing the required tests and inspections. Provisions must be made for applying an air test at
<br /> the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code. A
<br /> manometer test, as specified in Minnesota Rules,part 4715.2820, subpart 3, is required at the time of the finished
<br /> plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota Department of Labor
<br /> and Industry when an installation for a state contract job, Minnesota Department of Health licensed healthcare
<br /> facility, or project in an area where there is no local administrative authority is ready for an inspection and test. To
<br /> schedule inspections,contact the state plumbing standards representative for your region. For your regional
<br /> inspector's contact information,visit our website at http://www.dli.mn.gov/CCLD/CCLDContactus.asp
<br /> REQUIREMENT(S):
<br /> 1. All commercial kitchen sinks,with the exception of mop sinks and hand sinks, shall be provided with 3/4-
<br /> inch hot and cold water supply branch lines as a minimum(see Minnesota Rules, part 4715.1730, subpart 2).
<br /> The pot and preparation sinks shall comply with this requirement.
<br /> 2. The horizontal branch serving a dishwasher, pot sink,and the floor drain must be at least 2-1/2 inches in size.
<br /> 3. Any pot or scullery sink must be provided with waste outlets not less than 2 inches in diameter(see
<br /> Minnesota Rules,part 4715.1390, subpart 1). Verify compliance for this requirement.
<br /> 4. Water supply connections to fixtures or equipment which have submerged inlets,or inlets below the spill line
<br /> of the fixture or equipment,must be provided with an air gap arrangement, approved backflow preventer or
<br /> backflow preventer assembly as specified in Minnesota Rules,part 4715.2000 and part 4715.2010.
<br /> This information can be provided to you in alternative formats(Braille,large print or audio).
<br /> An Equal Opportunity Empioyer
<br />
|