My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: additional plumbing info
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2180 North Shore Drive - 10-117-23-31-0098
>
Correspondence
>
Re: additional plumbing info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:24:57 PM
Creation date
10/3/2017 1:05:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
North Shore
Street Type
Drive
Address
2180 North Shore Drive
Document Type
Correspondence
PIN
1011723310098
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Hill School <br /> Plumbing <br /> Plan No. 065378 <br /> Page 3 <br /> August 9, 2006 <br /> 14. In all buildings other than dwellings, shutoff valves shall be installed which permit the water supply to all <br /> equipment in each separate room or to each individual fixture to be shut off without interference with the <br /> water supply to any other room or portion of the building(see Minnesota Rules,part 4715.1800, subpart 6). <br /> NOTE(S): <br /> 1. The scope of this project consists of the addition to an existing building. The plumbing installation includes <br /> water closets,urinals, lavatories,mop sinks,a break room sink,water heater, and floor drains. <br /> 2. This facility will be served by a new private well and an existing municipal sewer service connection. <br /> 3. The plans and specifications were prepared by a licensed master plumber. The plumber who has prepared <br /> the plans is the only one that can use the plans for construction. If another plumber is contracted to install <br /> the plumbing, they must submit their own plans and specifications for the project. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information, or advanced knowledge make improvements necessary. <br /> A roved: <br /> Todd Schaefe <br /> Public Health Engineer <br /> Plumbing Plan Review and Inspections Unit <br /> 443 Lafayette Road North <br /> St. Paul,Minnesota 55155-4343 <br /> 651/284-5884 <br /> TDS:sas <br /> cc: Project Owner <br /> Dale Sorensen Company <br /> Mr. Lyle Oman,Building Official/ <br /> File <br />
The URL can be used to link to this page
Your browser does not support the video tag.